Commercial General Building, Demolition, Electrical, Hvac/Mechanical work permitted February 21, 2025, with 13 permits through September 17, 2026, declaring $6,113,101 of work. Contractor on record: Prime Electric.
Demolish existing shed and switchgear enclosure in existing commercial complex (Maritime Industrial Center) per plan.
Seattle permit records name Prime Electric, Guardian Security Systems Inc and Kirby Electric Incorporated as the contractors on this project, among 7 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
13 permits issued Feb 21 – Sep 17, newest first.
| Issued | Permit | Contractor |
|---|
Commercial and multifamily, biggest first.
| Value |
|---|
#7163063-EL Electrical · Electrical Added WP fire alarm heat detector for elevator recall - 2 devices. Status: Issued | Guardian Security Systems Inc | — | |
#7160242-EL Electrical · Electrical Machine room: Replace (1) existing disconnect in machine room with new fusible disconnect including auxiliary Location of disconnect to remain Refeed controllers from new disconnect, new controller going in, but remaining at 40hp Add power and disconnect for the new split system Provide a 3/4"… Status: Completed | Kirby Electric Incorporated | — | |
| applied Apr 14 | #7138239-EL Electrical · Electrical Building fire alarm system. Install new fire alarm system. Building monitored by new AES radio Status: Completed | Guardian Security Systems Inc | $62.8K |
#7135441-EL Electrical · Electrical Installation of pathway only at the Maritime Industrial Building for communications cabling. Status: Issued | Apex Electrical Group LLC | — | |
| applied Mar 5 | #7130137-ME Mechanical · Trade 1. Install one 2-ton split system outdoor wall mount heat pump unit with one indoor wall hung ductless air handler unit. 2. Install one condensate pump. Status: Issued | Not published | $9.2K |
| applied Mar 10 | #7132772-RF Refrigeration · Trade Install refrigerant piping for a 2-ton split system heat pump. Status: Issued | Performance Heating and AC | $600 |
| applied Oct 3 | #7097339-DM Demolition · Demolition Demolish existing shed and switchgear enclosure in existing commercial complex (Maritime Industrial Center) per plan. Status: Completed | Not published | $4.6M |
#7125622-EL Electrical · Electrical Status: Issued | Prime Electric | — | |
| applied Jan 7 | #7123334-EL Electrical · Electrical Job# 8001000 - Electrical Infrastructure modernization - replacement of 2 existing switchboards and provision of 1 additional switchboard location, including all associated feeder/conduit/cabling distribution Brent Cooper is the contact (425)531-5156. [1/14/25 BGO - Approved Plan Set; Approval… Status: Issued | Prime Electric | $1.1M |
| applied Sep 5 | #7097338-CN Addition/Alteration · Building Construct new switch gear enclosures for existing commercial complex (Maritime Industrial Center) per plan Status: Issued | Not published | $4.6M |
#7111989-EL Electrical · Electrical 127159-001- APEX Maritime Cameras-Phase 1- Low voltage - CCTV installation and LV cable Demo Status: Completed | McKinstry Co LLC | $3K | |
#7093005-EL Electrical · Electrical Job 8001000: Repair feeder wire for existing pedestal power for boats. Site contact: Andrew Wissink (425) 429-1768. 5/26/2026 jnl renewal Status: Completed | Prime Electric | $285K | |
#7071720-EL Electrical · Electrical Remodel Status: Completed | Electrical Sys Solutions Inc | $2.5K |