Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Elevator, Fire Protection work permitted December 6, 2024, with 27 permits through October 15, 2026, declaring $1,355,391 of work. Contractor on record: Prime Electric.
Construct interior non-structural alterations for 4th floor tenant space [E-BIKE SMART FACTORY] in commercial building [BON MARCHE] subject to field inspection [STFI].
Seattle permit records name Prime Electric, Cochran Inc and Veca Electric & Technologies, LLC as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 6 permits issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
27 permits issued Dec 6 – Oct 15, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 10 | #7166521-EL Electrical · Electrical SWITCHBOARD MODERNIZATION. JOB# 830300. PM IS MOLLY PRICE 360-801-1052 [10/15/26 BGO - Approved Plan Set; See my comments regarding replacement parts on plan page 3] Status: Issued | Contractor with Pro | $300K |
| applied Oct 2 | #7165372-CY Conveyance · Trade 300 PINE CAR 5- KONE MONITERING - Car E EQP-SI-10483 / EQP-CY-09689 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Completed | Contractor with Pro | $1K |
| applied Oct 2 | #7165376-CY Conveyance · Trade 300 PINE - CAR G - INSTALL KONE MONITERING EQP-SI-10483 / EQP-CY-09762 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Completed | Contractor with Pro | $1K |
| applied Oct 2 | #7165386-CY Conveyance · Trade 300 PINE - KONE Monitoring System - CAR H EQP-SI-10483 / EQP-CY-10324 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Completed | Contractor with Pro | $100 |
| applied Oct 2 | #7165389-CY Conveyance · Trade 300 PINE - CAR 14 - INSTALL KONE MONITERING EQP-SI-10483 / EQP-CY-01923 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Completed | Contractor with Pro | $1K |
| applied Oct 2 | #7165388-CY Conveyance · Trade 300 PINE - CAR 13 - INSTALL KONE MONITERING EQP-SI-10483 / EQP-CY-01925 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Issued | Contractor with Pro | $1K |
#7163213-FS Fire Sprinkler and Suppression · Trade TENANT IMPROVEMENT - ADD/RELOCATE FIRE SPRINKLERS FOR T.I. WALLS. PIPE SIZING AND K FACTOR OF NEW HEADS TO MATCH EXISTING, NO IMPACTS TO EXISTING HYDRAULIC CALCULATIONS. NO CHANGE OF OCCUPANCY FROM PREVIOUS BUILD. PATRIFP099CF. (7) Heads. Status: Issued | Not published | $6K | |
#7161652-EL Electrical · Electrical 531241: Install (4) cameras at Amazon SEA89 0B.109 & 110. Status: Issued | Not published | — | |
#7160782-EL Electrical · Electrical 531264-Power and pathway for (3) dedicated 120v 20-amp power drop reels Provide power and pathway to (5) duplex wall receptacle Status: Issued | Cochran Inc | — | |
#7156665-EL Electrical · Electrical Install REX for existing Crash bar at Amazon SEA89. Status: Completed | Cochran Inc | — | |
#7154192-EL Electrical · Electrical Install a total of (10) VSS devices at Amazon SEA89. Status: Completed | Cochran Inc | — | |
#7151835-EL Electrical · Electrical Adding (16) receptacles and (16) 30-50a Dedicated Circuits in Rooms B.201, B.204, B.205, B.207 Status: Issued | Prime Electric | — | |
| applied May 22 | #7144530-CN Addition/Alteration · Building Construct interior non-structural alterations for 4th floor tenant space [E-BIKE SMART FACTORY] in commercial building [BON MARCHE] subject to field inspection [STFI]. Status: Issued | Not published | $600K |
#7137232-EL Electrical · Electrical 300 Pine St- Job #1026196, adding (1) quad and (1) duplex, Basement level. Site Contact: Shawn Boulger 425-457-2224 Status: Issued | Prime Electric | — | |
| applied Dec 29 | #7120007-CN Addition/Alteration · Building Construct alterations at two (2) 1st floor entrances of existing commercial building (The Bon Marche) per plan Status: Issued | Not published | $70K |
#7133526-EL Electrical · Electrical 300 PINE ST- Job #1025998, (13) 120V 20 AMP DEDICATED CIRCUITS TO SWAS FLOOR, 3RD FLOOR. Site Contact: Shawn Boulger 425-457-2224 Status: Issued | Prime Electric | — | |
#7132057-EL Electrical · Electrical (1) 480V 30A CIRCUIT. JOB # IS 830707. PM IS MOLLY PRICE 360.801.1052 Status: Completed | Veca Electric & Technologies, LLC | — | |
#7128969-EL Electrical · Electrical Status: Completed | Sequoyah Electric LLC | — | |
#7121062-EL Electrical · Electrical Provide (4) outlets & (1) dedicated circuit-Seq Job #306376 Status: Completed | Not published | $7.2K | |
#7115443-EL Electrical · Electrical Install (3) 20A 120v circuits for lactation prep room-Seq Job #306337 Status: Completed | Not published | $14K | |
#7114364-EL Electrical · Electrical SEA89 528679 - Convert the 8th floor to a zone 5 space. Status: Completed | Not published | $60K | |
| applied Sep 17 | #7104105-CN Addition/Alteration · Building Tenant improvement to 8th floor of existing commercial building per plan. Status: Completed | Not published | $70K |
| applied Jun 24 | #7088913-CN Addition/Alteration · Building Install anchorage at level 1 and level 1 mezzanine of existing commercial building for future building maintenance system per plan. Status: Completed | Not published | $250K |
#7105234-EL Electrical · Electrical Job 4006089: Provide and install (1) duplex receptacle. Site contact: Shawn Boulger (425) 457-2224 Status: Completed | Prime Electric | $2.6K | |
#7085833-EL Electrical · Electrical Job 4005631: Adding (28) general use receptacles. Contact: Shawn Boulger 425-457-2224 Status: Completed | Prime Electric | $7.5K | |
#7068021-EL Electrical · Electrical JOB # 526525 - REWIRE (4) DOOR PACKAGES AT SEA89 Status: Completed | Not published | $16K | |
#7059753-EL Electrical · Electrical JOB # 526111 - Install CR IN/OUT Door package at SEA89-A.410 Status: Completed | Not published | $21K |
In Seattle, biggest first.