Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted June 17, 2025, with 12 permits through August 19, 2026, declaring $548,407 of work. Contractor on record: H&M Electric.
Construct blanket permit tenant improvements to Department of Transportation - Ferries on floors: 1 4 and 5 of existing commercial building per plan.
Seattle permit records name H&M Electric, Prime Electric and PowerCom, Inc. as the contractors on this project, among 7 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
12 permits issued Jun 17 – Aug 19, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#7158784-EL Electrical · Electrical Group 5 Cisco Seattle - Job 1027688: (2) 20A circuits. Status: Completed | Prime Electric | — | |
#7134785-EL Electrical · Electrical Providing low voltage cabling for Washington State Ferry for WSDOT. Powercom job# 451832 Status: Completed | PowerCom, Inc. | — | |
#7132269-EL Electrical · Electrical Installing Camera System (7) IP Cameras Status: Issued | Simple Security Solutions | — | |
#7131951-EL Electrical · Electrical adding 4 strobes adding 2 speakers Status: Issued | Not published | — | |
| applied Jan 7 | #7112155-ME Mechanical · Trade 1st Floor - Demo, relocate up to 20 supply and return grilles. Duct work and fitting modifications as needed. 4th Floor - install (2) owner provided WSHP, (9) new supply grilles, up to (3) return grilles, relocate (30) existing supply and return grilles, duct work modifications as needed. 5th… Status: Completed | PSF Mechanical, Inc. | $75K |
#7125475-FS Fire Sprinkler and Suppression · Trade Relocate 2 pendent sprinklers as required for new wall on level 1. Replace 1 leaking section of pipe at drop location. Status: Completed | Empire Fire Protection | $2.3K | |
| applied Sep 22 | #7107783-BK Tenant Improvment · Building Construct blanket permit tenant improvements to Department of Transportation - Ferries on floors: 1 4 and 5 of existing commercial building per plan. Status: Completed | Not published | $373K |
#7115157-EL Electrical · Electrical TI area on 1st floor Status: Completed | H&M Electric | $17.5K | |
#7115162-EL Electrical · Electrical TI area on 4th floor Status: Completed | H&M Electric | $47.6K | |
#7115165-EL Electrical · Electrical TI area on 5th floor Status: Completed | H&M Electric | $3.3K | |
#7098200-EL Electrical · Electrical Updates to existing electrical infrastructure to support additional IT racks in existing lab room. Status: Completed | Teknon Electrical Services | $28K | |
#7091694-EL Electrical · Electrical JCI to install one door contact on the breakroom door. JCI to utilize the existing Focus 200 panel Status: Completed | Not published | $1.2K |