Get Procommercial project · Seattle, WA
Commercial Electrical, Elevator, Hvac/Mechanical work permitted November 17, 2024, with 11 permits through October 20, 2026, declaring $281,727 of work. Contractor on record: McKinstry Co LLC.
EQP-SI-04325 / EQP-CY-00758 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) New Tac32 controller w/battery lowering,EP-80 pump unit, shut off & overspeed valves,cartop exit,wiring & traveling cable, LD16 drive only door operator,3D door detector, cartop inspection station,selector,terminal limits, car & hall fixtures with 2019 code reqs, two way comm
Seattle permit records name McKinstry Co LLC, Performance Systems, Puget Sound and Pacific Power Group as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
11 permits issued Nov 17 – Oct 20, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 5 | #7146433-EL Electrical · Electrical 05616255 - Replace an existing releasing fire alarm control panel for a deluge system around the generator at the back of the building. All field devices are to remain. Status: Issued | Contractor with Pro | $11.1K |
#7162277-EL Electrical · Electrical Replacing 2) 50-amp 208-volt circuits Status: Completed | McKinstry Co LLC | — | |
| applied Jun 10 | #7140611-ME Mechanical · Trade Replacement of (2) gas packs with heat pumps, per plan. Status: Issued | McKinstry Co LLC | $65.5K |
#7136688-EL Electrical · Electrical 05807902 - Communicator installation and antenna to monitor FACP (LV ONLY) Status: Completed | Performance Systems, Puget Sound | — | |
#7134267-EL Electrical · Electrical 05616255 - Replace an existing releasing fire alarm control panel for a deluge system around the generator at the back of the building. All field devices are to remain. Status: Completed | Performance Systems, Puget Sound | — | |
#7123598-EL Electrical · Electrical Status: Issued | Pacific Power Group | — | |
#7094444-EL Electrical · Electrical Reworking electrical and fire alarm conduit, demo existing pit lighting and conduit in pits. Demo existing disconnects. Installing new machine room sub panel, installing new machine room sub panel. Install raceways for fire alarm recall relays in machine room and pit. Install mini split unit and… Status: Completed | Pro-Tech Electric Inc | $36K | |
| applied Jun 17 | #7091449-CY Conveyance · Trade EQP-SI-04325 / EQP-CY-00757 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) New TAC32 controller w/battery lowering, two way communicatioins, car & hall fixtures w/2019 code comm requirements, cartop exit,wiring, traveling cable, LDS16 drive only door operator, 3d door… Status: Completed | TK Elevator | $76.7K |
| applied Jun 17 | #7091458-CY Conveyance · Trade EQP-SI-04325 / EQP-CY-00758 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) New Tac32 controller w/battery lowering,EP-80 pump unit, shut off & overspeed valves,cartop exit,wiring & traveling cable, LD16 drive only door operator,3D door detector, cartop inspection station,selector,terminal… Status: Completed | TK Elevator | $85K |
#7086827-EL Electrical · Electrical LOAD BANK TESTING ON BACK UP ELECTRIC GENERATOR - SR00113227 Status: Completed | Pacific Power Group | $450 | |
#7056797-EL Electrical · Electrical supply 120 volt dedicated circuit for a stairway elevator,installing a 2 pole disconnect. Power to be run from 2nd floor Electrical Panel supplied by a single pole 20 amp breaker Status: Completed | Not published | $7K |