Multifamily Electrical, Elevator work permitted January 29, 2026, with 5 permits through August 13, 2026, declaring $88,700 of work. Contractor on record: Kirby Electric Incorporated.
Modernization Controller, Car and Hall fixtures, 3D door edge and Retain Power unit EQP-SI-07257 / EQP-CY-06204 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1)
Seattle permit records name Kirby Electric Incorporated, Elevations Ltd and Kemly Electric, Inc. as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Jan 29 – Aug 13, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7157976-EL
Electrical · Electrical
Perform a elevator modernization which consists of, new disconnect to elevator controller, refeed new controller feeding existing 25hp elevator motor, replace existing lights with LED, replace existing receptacles with GFCI.
Status: Completed
| Kirby Electric Incorporated |
| — |
| applied Aug 11 | #7157368-CY Conveyance · Trade Remove and replace flooring and ceiling. Replace with in kind materials. Apply new laminate walls covering directly to existing cab shell and install new handrails. EQP-SI-07257 / EQP-CY-06204 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Completed | Elevations Ltd | $18.7K |
#7151837-EL Electrical · Electrical New undercabinet lighting Status: Completed | Kemly Electric, Inc. | — |
| applied Apr 20 | #7134058-CY Conveyance · Trade Modernization Controller, Car and Hall fixtures, 3D door edge and Retain Power unit EQP-SI-07257 / EQP-CY-06204 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Elevator Support Company LLC | $70K |
#7127131-EL Electrical · Electrical Status: Issued | Sequoyah Electric LLC | — |