Multifamily Electrical, Hvac/Mechanical work permitted November 13, 2024, with 4 permits through June 12, 2026, declaring $8,231,709 of work. Contractor on record: SJS Mechanical.
Get new commercial permits near 98109 or Seattle, free weekly email
New construction, multifamily residential. The hot water system consists of (4) AO Smith BTH-400 gas boilers, (1) AO Smith DEL-20 electric water heaters, (1) EEmax SP3012 electric water heater, (1) Amtrol ST-210VC, (1) Wessels FXA-300, and (1) Amtrol ST-5C.
Seattle permit records name SJS Mechanical as the contractor on this project.
4 permits issued Nov 13 – Jun 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7147848-EL Electrical · Electrical Install 3 20 amp 120v circuits for self contained refrigerated cases Status: Completed | Not published | — |
Commercial and multifamily, biggest first.
#7063555-BP Boiler/Pressure Vessel · Trade New construction, multifamily residential. The hot water system consists of (4) AO Smith BTH-400 gas boilers, (1) AO Smith DEL-20 electric water heaters, (1) EEmax SP3012 electric water heater, (1) Amtrol ST-210VC, (1) Wessels FXA-300, and (1) Amtrol ST-5C. Status: Completed | SJS Mechanical | $8.2M |
#7063564-BP Boiler/Pressure Vessel · Trade New construction, multifamily residential. The hot water system consists of (4) AO Smith BTH-400 gas boilers, (1) AO Smith DEL-20 electric water heaters, (1) EEmax SP3012 electric water heater, (1) Amtrol ST-210VC, (1) Wessels FXA-300, and (1) Amtrol ST-5C. Status: Completed | SJS Mechanical | $8.2M |
#7056089-EL Electrical · Electrical Install one 120v receptacle for media kiosk [C.Kenefick 11/14/24 -fees adjusted to reflect 6 receptacles installed: two in parking garage, one at each entrance and exit ramp, one each on the sales floor at each entrance and emergency exit doors. Nothing at kiosk.] Status: Completed | Not published | $500 |