Get ProEvery project in every city · from $33/mo
Get Procommercial project · Seattle, WA
Commercial Electrical, Elevator, Hvac/Mechanical work permitted December 23, 2024, with 9 permits through September 23, 2026, declaring $4,054,250 of work. Contractor on record: Kone Inc (Primary).
New Construction, commercial. The hot water system consists of (2) Electric Water Heaters A.O Smith DVE-300A, (1) Storage Tank A.O SMith HD*54-1000A, (1) Expansion Tank ST-449C. (1) Hydropneumatics Tank.
Seattle permit records name Kone Inc (Primary), Haggard Electrical Contracting and Tri-Tec Communications as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
9 permits issued Dec 23 – Sep 23, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#7164027-EL Electrical · Electrical modified a circuit to make a 3-way for the emergency shutoff Status: Completed | Haggard Electrical Contracting | — | |
#7148081-EL Electrical · Electrical Provide and install (2) 20 amp circuits from the kitchen panel to the Waffle bar (1) quad with (2) white receptacles Status: Completed | Haggard Electrical Contracting | — | |
| applied Jun 25 | #7093085-CY Conveyance · Trade Alteration - Hall Security + Car Security Addition CAR 1 EQP-SI-11365 / EQP-CY-11042 (2021 SBC=2019 A17.1=2023 NEC/SEC=2020 A18.1) Status: Completed | Kone Inc (Primary) | $5K |
| applied Jun 25 | #7093086-CY Conveyance · Trade Alteration - Hall Security + Car Security Addition car 2 EQP-SI-11365 / EQP-CY-11043 (2021 SBC=2019 A17.1=2023 NEC/SEC=2020 A18.1) Status: Completed | Kone Inc (Primary) | $5K |
| applied Apr 8 | #7079619-EL Electrical · Electrical Installing (4) New 40amp EV chargers on an existing panel. [4/16/25 BGO - Approved EVSE Plan] Status: Completed | Not published | $13K |
#7069762-EL Electrical · Electrical Installing 21 cameras. The cables have already been ran by another contractor( permit 6927745-EL) and we are just installing the endpoint cameras. Status: Completed | Tri-Tec Communications | $28K | |
#7065606-BP Boiler/Pressure Vessel · Trade New Construction, commercial. The hot water system consists of (2) Electric Water Heaters A.O Smith DVE-300A, (1) Storage Tank A.O SMith HD*54-1000A, (1) Expansion Tank ST-449C. (1) Hydropneumatics Tank. Status: Completed | SJS Mechanical | $3.8M | |
| applied Jan 16 | #7065651-CY Conveyance · Trade Temp Use 7016134-CY (Original Installation Permit) 60-day temp use permit valid from date signed by City of Seattle elevator inspector. Must have two-way communication with operator at all times. Status: Completed | Kone Inc (Primary) | $206K |
#7062326-EL Electrical · Electrical Northwest Fire Systems will be installing a cellular communicator to monitor the FACP. Status: Completed | Northwest Fire Systems LLC | $2K |
In Seattle, biggest first.