Get Promultifamily project · Seattle, WA
Multifamily Electrical, Elevator, Hvac/Mechanical work permitted December 11, 2024, with 10 permits through May 4, 2026, declaring $174,866 of work. Contractor on record: Tke.
Installing New 225A panel using existing spare breaker slot in 2H. 20 Electric Vehicle (EV) chargers installed in stalls 137-142, 131-135, 254-263. Future stub outs in 251-254 [12/11/24 BGO - Fee OK; Approved EVSE Plan Set]
Seattle permit records name Tke, Ocean Park Mechanical Inc and Pacific Power Group as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
10 permits issued Dec 11 – May 4, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#7141257-EL Electrical · Electrical ERCES SCOPE OF WORK TO BE PERFORMED - REMOVE AND REPLACE ONE MASTER UNIT & ONE REMOTE UNIT - REMOVE AND REPLACE DAS ANTENNA ON THE ROOF WITH A PSERN COMPLIANT ANTENNA Status: Completed | Not published | — |
#7139471-EL Electrical · Electrical Adding power to Rooftop HVAC unit. 240v 20amp max fuse breaker and outdoor nema3 fused disconnect. Status: Completed | Not published | — |
| applied Apr 16 | #7138723-RF Refrigeration · Trade Install ductless split system on level 35. Status: Issued | Ocean Park Mechanical Inc | $10K |
#7138717-EL Electrical · Electrical Install new new mini-split on level 35. Status: Issued | Ocean Park Mechanical Inc | — |
#7137845-EL Electrical · Electrical Load bank testing of emergency back up generator - 124582 Status: Completed | Pacific Power Group | — |
| applied Jun 30 | #7093810-EL Electrical · Electrical Upgrade to 225A panel, upgrade to 45A circuits [7/21/25 KEF - Plan set approved.] Status: Completed | Not published | $18K |
| applied May 20 | #7086604-CY Conveyance · Trade Install and wire proximity switch-1377228 RO:4898333 Conv:13539 US:627431 EQP-SI-11004 / EQP-CY-10548 (2021 SBC=2019 A17.1=2023 NEC/SEC=2020 A18.1) Status: Completed | Tke | $11.8K |
| applied May 20 | #7086613-CY Conveyance · Trade Install and wire proximity switch-1377228 RO:4898334 CONV:13540 Car 4 US:627432 EQP-SI-11004 / EQP-CY-10549 (2021 SBC=2019 A17.1=2023 NEC/SEC=2020 A18.1) Status: Completed | Tke | $11.8K |
| applied May 6 | #7084197-CY Conveyance · Trade Install and wire proximity switch to monitor the drive sheave shaft deflection-1275579. CON:13833 US:627430 RO:4579150 EQP-SI-11004 / EQP-CY-10547 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Tke | $1.1K |
| applied Dec 4 | #7059257-EL Electrical · Electrical Installing New 225A panel using existing spare breaker slot in 2H. 20 Electric Vehicle (EV) chargers installed in stalls 137-142, 131-135, 254-263. Future stub outs in 251-254 [12/11/24 BGO - Fee OK; Approved EVSE Plan Set] Status: Completed | Not published | $134K |