Commercial Electrical, Elevator, Hvac/Mechanical work permitted November 7, 2024, with 7 permits through April 17, 2026, declaring $222,283 of work. Contractor on record: 16d LLC.
Hydro Mod- New Pump Unit, OSV, Controller, COP, Hall Fixtures, 3D Door Edge, Car Door, Door Operator, Interlocks and Hoistway Wiring - Car 2 EQP-SI-05806 / EQP-CY-03439 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1)
Seattle permit records name 16d LLC, Fujitec America and As You Wish Electric as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
7 permits issued Nov 7 – Apr 17, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
| applied Apr 17 |
#7138237-CY Conveyance · Trade Hydro Mod- New Pump Unit, OSV, Controller, COP, Hall Fixtures, 3D Door Edge, Car Door, Door Operator, Interlocks and Hoistway Wiring - Car 2 EQP-SI-05806 / EQP-CY-03439 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed |
| Fujitec America |
| $178K |
| applied Apr 17 | #7138238-CY Conveyance · Trade Hydro Mod- New Pump Unit, OSV, Controller, COP, Hall Fixtures, 3D Door Edge, Car Door, Door Operator, Interlocks and Hoistway Wiring - Car 1 EQP-SI-05806 / EQP-CY-03440 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1 Status: Completed | Fujitec America | $178K |
#7134675-EL Electrical · Electrical Upgrade elevator disconnects. Relocate elevator utilization circuits OCP to mach room panel. Upgrade mach room and pit lights to LED Status: Completed | 16d LLC | — |
| applied Feb 10 | #7122385-ME Mechanical · Trade For the purpose of elevator modernization: Install split unit in each of two existing elevator machine rooms and adjacent patio spaces, per plans. Status: Completed | Not published | $17.1K |
| applied Feb 10 | #7128663-EL Electrical · Electrical For the purpose of elevator modernization: Replace fire panels with one addressable and add devices to elevator machine room Status: Completed | 16d LLC | $19.8K |
| applied Dec 23 | #7122387-RF Refrigeration · Trade For the purpose of elevator modernization: Refrigeration permit for 7122385-ME Status: Completed | 16d LLC | $17.1K |
#7055264-EL Electrical · Electrical 150amp panel change Status: Completed | As You Wish Electric | $7.5K |