Commercial Electrical, Elevator work permitted November 18, 2024, with 4 permits through June 10, 2026, declaring $117,410 of work. Contractor on record: Empyrean dba Washington Elevator.
Elevator modernization - controller, door operator, hall and car fixtures, pump unit, rupture valve, shut off valves, 3D edge EQP-SI-05360 / EQP-CY-02711 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1)
Seattle permit records name Empyrean dba Washington Elevator, Seacom Cabling Inc and Merit Electric, Inc. as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Nov 18 – Jun 10, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7146323-EL Electrical · Electrical Elevator Dedicated Function Panel for Elevator Modernization Status: Issued |
| Seacom Cabling Inc |
| $16.7K |
#7138773-EL Electrical · Electrical Electrical upgrades for an elevator modernization to meet current elevator codes. Status: Completed | Merit Electric, Inc. | — |
| applied Apr 14 | #7137993-CY Conveyance · Trade Elevator modernization - controller, door operator, hall and car fixtures, pump unit, rupture valve, shut off valves, 3D edge EQP-SI-05360 / EQP-CY-02711 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Empyrean dba Washington Elevator | $93K |
| applied Nov 18 | #7056945-CY Conveyance · Trade Oil line corroded due to water intrusion over the years. Replacing oil line and adding shut off/surge valves per code. EQP-SI-05360 / EQP-CY-02711 (2018 SBC=2020 SEC=2019 A17.1=2017 A18.1) Status: Closed | Empyrean dba Washington Elevator | $7.7K |