Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted October 30, 2024, with 129 permits through October 21, 2026, declaring $9,453,746 of work. Contractor on record: Cochran Inc.
Full floor TI including lighting, power, low voltage pathway in all areas not grayed out.
Seattle permit records name Cochran Inc, Titan Electric Inc and Static Energy, Inc as the contractors on this project, among 19 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 4 permits issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
129 permits issued Oct 30 – Oct 21, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7168653-EL Electrical · Electrical Adding turnstiles to the lobby. Control relays (2) being install for integration with the fire alarm system. Status: Issued | Contractor with Pro | — | |
#7168276-FS Fire Sprinkler and Suppression · Trade Add and relocate 10 heads in hallway hard lid. Status: Issued | Contractor with Pro | $9.2K | |
#7168453-EL Electrical · Electrical Audio/Video installation Status: Issued | Not published | — | |
| applied Oct 1 | #7164232-EL Electrical · Electrical Madison Centre EV Upgrade - Job 6008080: Installation of (1) 150kVA transformer and (1) 3-phase 400A 120/208v panel intended to serve the installation of (13) new Flash EV charging stations within the Madison Centre parking garage. Transformer and panel will be fed from an existing house panel.… Status: Issued | Contractor with Pro | $106K |
#7164165-EL Electrical · Electrical Class 2 LV HVAC (1) New FCU with field mounted and wired controls (8) New VAVs with field mounted and wired controls. Status: Completed | Static Energy, Inc | — | |
| applied Jul 15 | #7151731-CN Addition/Alteration · Building Construct tenant improvement to existing commercial building at level 19 tenant space (Stripe) occupy per plan. Status: Issued | Not published | $888K |
#7159999-EL Electrical · Electrical Joint venture between Convergint and Titan Electric. Installing 16 notification devices. Associated with building permit 7134943-CN Status: Issued | Not published | $1.2K | |
#7162770-EL Electrical · Electrical 8 rooms with simple audio video systems - touchpanel, display and camera bar type systems. 4 restrooms with ceiling speakers Status: Issued | One Diversified | — | |
#7162779-EL Electrical · Electrical Two room schedulers, very simple audio-video in two phone rooms, two digital signs and a pair of distributed audio speakers. Status: Issued | One Diversified | — | |
#7160787-EL Electrical · Electrical 530868 - Installation of (3) banks of turnstiles and retrofit of access control system to include replacing (3) panels. Adding (3) POE cameras and (2) network drops at security desk. Status: Issued | Cochran Inc | — | |
#7160842-EL Electrical · Electrical Installation of (4) card reader doors, (8) network cameras, (2) turnstiles & Headend Status: Issued | Cochran Inc | — | |
#7159473-EL Electrical · Electrical Installation (7) access control doors & (1) panel/headend Status: Completed | Cochran Inc | — | |
#7158908-EL Electrical · Electrical 85943 - Provide 120v power for power supply in access control enclosure Status: Completed | Cochran, Inc. | — | |
| applied Aug 12 | #7157758-EL Electrical · Electrical Decom of old commercial kitchen and change to smaller micro kitchen, replace lighting and controls, new reception area lighting, new mail room, updated restroom lighting, new insta hots for restrooms, adding turnstiles [8/19/26 BGO - Approved Plan Set] Status: Issued | Cochran Inc. | $417K |
#7158435-EL Electrical · Electrical Installation of (46) Cat6 cables to a total of (29) device locations Status: Issued | Cochran Inc | — | |
| applied Aug 11 | #7157053-ME Mechanical · Trade Add (1) wall mounted FCU. Run Chilled water and condensate Status: Issued | Not published | $25K |
#7157199-EL Electrical · Electrical Adding turnstiles relay to L19. Added strobes to (2) phone booths. Notification coverage in AGR and janitor closet Status: Issued | Convergint Technologies | — | |
#7155786-EL Electrical · Electrical Add (1) dedicated 120V 20A circuit for new turnstiles on L1 Lobby. Add (1) 120V 20A circuit and (2) receptacles for new security desk on L1 Lobby. Disconnect power to (4) access control panels and reconnect power to (4) new access control panels in same locations. Run low voltage conduit pathway… Status: Issued | Cochran Inc. | — | |
| applied Jul 15 | #7152834-EL Electrical · Electrical Revision to 7130064-EL/7148348-EL (PR97838). Correctly marked REV2 for this project removes south east corner of the floor notification to be permitted later. FSD removal to align with mechanical drawings and additional phone booths added. Status: Completed | Convergint Technologies | $2K |
#7154794-FS Fire Sprinkler and Suppression · Trade Add and relocate fire sprinklers as required for tenant improvements. Status: Issued | Patriot Fire Protection | $9.1K | |
#7154591-EL Electrical · Electrical Install modular furniture (power wiring by others) Status: Completed | SES, Inc | — | |
#7153189-EL Electrical · Electrical Class 2 LV HVAC Controls. (3) New FCUs with field mounted and wired controls. (2) New EFs with field mounted and wire start/stop/status. (EF-2304, 2305) (12) Relocated VAVs and associated thermostat. (VAV-2301, 2302, 2304, 2307, thru 2311, 2315, 2322, 2323, 2321). Status: Completed | Static Energy, Inc | — | |
#7151370-EL Electrical · Electrical Replacing 9 door Access Control head end & power supply. Modify (1) existing 20amp circuit. SEQ#7418493 Status: Completed | Not published | — | |
| applied Jun 25 | #7149777-ME Mechanical · Trade Demolition/rework of existing ductwork for new layout on L19. New duct and grilles will be installed per the plans. STFI subject to field inspections Status: Issued | Not published | $45K |
#7148615-EL Electrical · Electrical 22 rooms with simple audio visual systems - touchpanel, display and camera bar type systems. Status: Issued | One Diversified | — | |
#7148737-EL Electrical · Electrical Install (2) turnstiles, swap out (7) electric transfer hinges Status: Issued | Cochran Inc | — | |
#7147087-EL Electrical · Electrical 530455 - Install 120v power for power supply Status: Completed | Cochran, Inc. | — | |
#7146481-EL Electrical · Electrical 1lot Provide 20amp 120v receptacles - Job#:2601286 Status: Issued | Titan Electric Inc | — | |
#7145783-EL Electrical · Electrical Class 2 LV HVAC Controls. L5: Relocate (5) Thermostats (VAV-0502, 0513,0514, 0523, 0524). (6) Relocated VAVs and associated thermostat. (VAV-0501, 0511, 0512, 0515, 0516 0522). (1) Relocated WSHP and associated thermostat. (2) New VAVs with field mounted and wired controls. L16: Relocate… Status: Completed | Static Energy, Inc | — | |
#7145776-EL Electrical · Electrical Install (54) cat 6 to (29) locations Status: Completed | Cochran, Inc. | — | |
| applied Mar 12 | #7129996-CN Addition/Alteration · Building Remove connection stairs and infill floor between 25th & 26th floors of existing commercial building (Madison Centre) per plan. Status: Completed | Not published | $350K |
#7145137-EL Electrical · Electrical 530384 - Install 120v power from closet panel for installation of power supply. Status: Completed | Cochran, Inc. | — | |
#7145005-EL Electrical · Electrical Install fiber from the Cogent box on the 8th floor out to the 8th floor server room. Status: Issued | Summit Riser Systems Inc | — | |
#7144796-EL Electrical · Electrical Installation (1) door board, (1) power supply, (1) back up battery, (1) request to exit, (1) push to exit Status: Completed | Cochran Inc | — | |
#7144783-EL Electrical · Electrical Installation (2) controllers, (1) card reader, (1) intercom, (1) push button, (1) request to exit sensor Status: Completed | Cochran Inc | — | |
| applied May 4 | #7141419-EL Electrical · Electrical 7129996-CN joint venture with Titan Electric. Backfill of stairwell. EST3 fire alarm system. Supporting relocation of notification devices to support new room layout. Reprogramming alarm zones so that level 25 and 26 are separate alarm zones. Status: Completed | Titan Electric Inc | $10K |
| applied Apr 2 | #7135278-ME Mechanical · Trade Alterations to mechanical system on existing commercial building, per plans. Status: Issued | Not published | $105K |
#7142468-EL Electrical · Electrical Pulling 2 cables to install 2 touch panels Status: Issued | Avi-SPL LLC | — | |
#7142250-FS Fire Sprinkler and Suppression · Trade TENANT IMPROVEMENT - ADD/RELOCATE FIRE SPRINKLERS FOR T.I. NEW WALLS AND CEILINGS FOR REVISIONS TO EXISTING LIGHT HAZARD OFFICE SPACE. PATRIFP099CF. (12) Heads. Status: Completed | Not published | $5.5K | |
#7142106-EL Electrical · Electrical FURNISHING AND INSTALLING A 20 AMP BREAKER AND HOOKING UP 120V POWER Status: Completed | Titan Electric Inc | — | |
| applied Mar 25 | #7134958-ME Mechanical · Trade Relocation of (6) existing VAVs. Provide and install (2) new VAVs. Provide and install (1) new exhaust fan. Includes associated duct work, per plan Status: Completed | Not published | $90K |
#7141813-EL Electrical · Electrical TI of lighting remove and reinstall (20) new lighting fixtures and (2) 50A Receptacles. Status: Completed | Titan Electric Inc | — | |
#7141480-EL Electrical · Electrical Installation of (1) new camera, relocation of (1) camera and installation of a new door board Status: Completed | Cochran Inc | — | |
#7141501-EL Electrical · Electrical Adding 2 dedicated L6-30 receps and 1 dedicated 20amp quad to the 8th floor IDF in the new Dropbox space. Job# 530256 Status: Completed | Cochran Inc | — | |
#7139673-EL Electrical · Electrical Installation of (20) card reader doors, (2) intercoms, (1) access control panel, and (24) network cameras, and (2) turnstiles Status: Completed | Cochran Inc | — | |
#7139657-EL Electrical · Electrical SCER - MADISON CENTRE - Job 5005291: LOW VOLTAGE DATA CABLING CATEGORY 6- 207 CABLES Status: Completed | Prime Electric | — | |
| applied Apr 6 | #7136765-FS Fire Sprinkler and Suppression · Trade Add and relocate fire sprinklers as required for tenant improvement. Status: Completed | Patriot Fire Protection | $48.3K |
#7139443-EL Electrical · Electrical Installation of (176) Cat6 cables to (111) device locations. Installation of (1) 24-strand fiber optic cable between equipment rooms. Status: Completed | Cochran Inc | — | |
#7138958-EL Electrical · Electrical 530108 - Install pathway for door contact on 39th Floor rooftop door to Lenel panel located in rooftop electrical room, provide pathway for relocating existing camera in Chiller room vestibule to exterior stairwell, install stub ins from 3rd floor stairwell into SXP tenant space accessible grid in… Status: Completed | Cochran, Inc. | — | |
#7138434-FS Fire Sprinkler and Suppression · Trade TENANT IMPROVEMENT - 4 sprinklers - Modify existing sprinkler system for new tenant improvement wall and ceiling layout. Status: Completed | Not published | $5K | |
| applied Feb 20 | #7130064-EL Electrical · Electrical Joint venture with Cochran (J00287935) Building permit #7123909-CN. Level 23 buildout. Existing EST3 addressable fire alarm system with voice evacuation remaining. Existing NAC devices and wiring to be removed unless noted. New devices to be installed and supported by existing power supplies and… Status: Completed | Cochran Electric | $10K |
| applied Apr 2 | #7136424-EL Electrical · Electrical Full floor TI including lighting, power, low voltage pathway in all areas not grayed out. Status: Completed | Cochran Inc | $956K |
| applied Mar 17 | #7133770-FS Fire Sprinkler and Suppression · Trade Add and relocate sprinkler for TI wall and ceiling changes Status: Completed | Patriot Fire Protection Inc | $27.4K |
| applied Mar 16 | #7133344-FS Fire Sprinkler and Suppression · Trade TENANT IMPROVEMENT - ADD/RELOCATE FIRE SPRINKLERS FOR T.I. NEW WALLS AND CEILINGS FOR NEW SPEC SUITES. SPRINKLER COVERAGE FOR "AC1 BEAMS" AND "AC2 PLAID" TO COMPLY WITH NFPA 13 2022 EDITION SECTION 9.3.10 (1) (A) 10'x10' SPACING AND 18" CLEARANCE. PATRIFP099CF. (62) Heads. Status: Completed | Not published | $27.7K |
| applied Mar 19 | #7134310-EL Electrical · Electrical Joint venture between Convergint and Titan Electric. Installing 39 notification devices and one relay for access control panel interface. Associated with Building Permit# 7121553-BK Status: Completed | Not published | $3K |
| applied Mar 19 | #7134321-EL Electrical · Electrical Joint venture between Convergint and Titan Electric. Installing 37 notification devices and three relays for access control panel interface. Associated with Building Permit# 7130396-BK Status: Issued | Not published | $2.3K |
| applied Feb 16 | #7124792-CN Addition/Alteration · Building Tenant improvement to change office space into boardroom of 5th floor of existing commercial building occupy per plan. Status: Issued | Not published | $30K |
#7134577-EL Electrical · Electrical Install modular furniture on the 18th floor. Status: Completed | SES, Inc | — | |
| applied Feb 3 | #7126577-ME Mechanical · Trade Provide and install (1) new chilled water FCU, (2) new exhaust fans, and (1) new fire smoke damper. Relocate VAVs per plans. Status: Completed | Not published | $300K |
| applied Feb 26 | #7114247-CN Addition/Alteration · Building Construct tenant improvements to existing commercial building (Madison Centre) at 1st floor lobby per plan. Status: Issued | Not published | $280K |
| applied Mar 16 | #7133637-EL Electrical · Electrical JOB NUMBER 2676001. IT IS 8,254 SF, NON-STRUCTURAL INTERIOR TENANT IMPROVEMENT: WORK INCLUDES REUSING THE EXISTING FIXTURES, ADDING NEW LIGHT FIXTURES, LIGHT CONTROL, POWER RECEPTACLES, POWER TOFURNITURE, BREAKROOM, MECH EQUIPMENT, DATA, AV AND SECURITY ROUGH-IN. Status: Completed | Titan Electric Inc | $220K |
| applied Mar 17 | #7133665-EL Electrical · Electrical Titan Job# 2676002 - 9,975 SF, Non-Structural Interior Tenant Improvement: Work includes light fixtures, lighting controls, power and data, mechanical connections, furniture connections, breakroom. [3/19/26 KEF - Plan set approved.] Status: Completed | Titan Electric Inc | $300K |
#7133176-EL Electrical · Electrical Adding control relay for turnstile override. Phone booths in copy area Status: Completed | Cochran Electric | — | |
#7133037-EL Electrical · Electrical Demo 2 access control doors - devices and cable back to IDF, relocate 1 camera, install single lane turnstile, add access control to hallway door Status: Completed | Cochran Inc | — | |
#7133034-EL Electrical · Electrical Installing a 20amp 1pole breaker, install provided power/LV box, Furnish and Install pull string from ceiling to LV box Status: Completed | Titan Electric Inc | — | |
#7132426-EL Electrical · Electrical Furniture connection for (12) packs for workstations, relocating phone booths and (3) associated receptacles, relocating (3) receptacles for copy/print area, adding turnstiles to replace doors off main elevator lobby in open office area, terminate 1 side of (1) 24 Strand fiber in cabinet and… Status: Completed | Cochran Inc. | — | |
#7131463-EL Electrical · Electrical Class 2 LV DDC Controls. (1) Relocated existing WSHP (HHP-1701) (2) New EFs with field mounted and wire start/stop/status. (EF-1705, 1706) Demo/decommission (2) VAV boxes and return controller/thermostat to owner. (VAV-1724, 1725) (18) Relocated VAVs and associated thermostat. (VAV-1701… Status: Completed | Static Energy, Inc | — | |
#7131230-EL Electrical · Electrical Installation of (13) card reader doors, (2) intercoms, (1) access control panel, and (15) network cameras, (2) Turnstile Locations Status: Completed | Cochran Inc | — | |
#7130667-EL Electrical · Electrical 528088: Electrical connection for dishwasher in commercial kitchen Status: Completed | Cochran Inc. | — | |
| applied Jan 15 | #7123909-CN Addition/Alteration · Building Tenant improvements to office at level 23 of existing office building occupy per plan. Status: Completed | Not published | $900K |
#7130148-EL Electrical · Electrical Demo of existing telecom cable. Installation of (174) Category 6 cables to a total of (134) device locations. Installation of (1) 24-strand fiber optic cables between equipment rooms. Installation of (3) telecom equipment racks and associated ladder racking materials Status: Completed | Cochran Inc | — | |
| applied Nov 4 | #7115123-FS Fire Sprinkler and Suppression · Trade Add and relocate fire sprinklers as required for tenant improvements. Status: Issued | Patriot Fire Protection | $67.3K |
| applied Jan 8 | #7124134-FS Fire Sprinkler and Suppression · Trade We will be testing and performing a final inspection on 2ea stand alone ventless hood systems. They are identical mobile units with a pre installed fire suppression system having 1 cylinder, 2 heads, 1 detector and 1 manual pull station. Status: Completed | AAA Fire Protection | $4.8K |
#7125685-EL Electrical · Electrical Status: Completed | Prime Electric | — | |
| applied Nov 5 | #7114979-ME Mechanical · Trade Relocate (16) VAVs, (1) fan coil unit. Install (2) exhaust fans and new GRDs in ceiling. Status: Completed | Not published | $279K |
| applied Dec 18 | #7121841-EL Electrical · Electrical Existing EST3 addressable fire alarm system with voice notification. Existing NAC wiring on level 17 to be removed except where noted. All existing NAC devices to be removed. Shell and core devices to be replaced with new like-for-like notification devices. New notification devices outside the… Status: Completed | Cochran Electric | $14K |
#7124167-EL Electrical · Electrical Status: Completed | One Diversified | — | |
#7123459-EL Electrical · Electrical Status: Completed | Static Energy, Inc | — | |
| applied Dec 26 | #7122629-EL Electrical · Electrical Full floor TI including lighting, power, low voltage pathway throughout. [1/5/26 BGO - Approved Level 17 TI Plan Set] Status: Completed | Cochran Inc | $940K |
| applied Sep 25 | #7108743-EL Electrical · Electrical Joint venture between Convergint and Prime Electric. Installing power supply, sync module, 71 notification devices, and four relays. Status: Completed | Not published | $4.8K |
#7120792-EL Electrical · Electrical 81902 - Repair/replace lighting fixture in 20th floor library Status: Completed | Cochran, Inc. | $700 | |
| applied Dec 9 | #7120394-RF Refrigeration · Trade Install of refrigeration lines Status: Completed | Orca mechanical 24/7 | $10.7K |
| applied May 14 | #7085952-EL Electrical · Electrical EXISTING EST3 ADDRESSABLE FIRE ALARM SYSTEM WITH VOICE NOTIFICATION AND RATH 2-WAY COMMUNICATION SYSTEM TO REMAIN. ALL EXISTING NOTIFICATION AND SLC DEVICES ON LEVEL 18 TO BE REMOVED UNLESS OTHERWISE NOTED. EXISTING POWER SUPPLIES TO REMAIN AND BE UTILIZED TO SUPPORT NEW NOTIFICATION DEVICES.… Status: Completed | Cochran, Inc. | $33K |
| applied May 14 | #7085894-FS Fire Sprinkler and Suppression · Trade Add and relocate fire sprinklers as required for tenant improvements. install new sprinkler risers in both stairwells to make two separate sprinkler loops that are dual fed per City of Seattle requirements. Status: Completed | Patriot Fire Protection | $35K |
#7115451-EL Electrical · Electrical Madison Centre Level 8 - Job 8001074: Install (qty.1) 480V 50A pigtail, running SO cord from level 5-8. Site contact: Matt Peterson (425) 531-8592 Status: Completed | Prime Electric | $1.5K | |
| applied Mar 6 | #7067605-CN Addition/Alteration · Building Tenant improvements in a commercial building on the 18th floor to install a Horizontal Exit and create a cafeteria occupy per plan. Status: Completed | Not published | $300K |
#7113462-EL Electrical · Electrical Job# 528053 - Installation of (14) card reader doors, (2) intercoms, (1) access control panel, and (22) network cameras. Status: Completed | Cochran Inc | $127K | |
| applied Oct 9 | #7110337-EL Electrical · Electrical Madison Centre Level 8 - Job 8001074: Full 8th Floor TI Including Distribution, Lighting, HVAC, Fire Alarm, and Power Adds. Site contact: Matt Peterson (425) 531-8592 [10/16/25 BGO - Approved TI Plan Set] [10/28/25 BGO - Approved Revised Plan Set] Status: Completed | Prime Electric | $614K |
#7111216-EL Electrical · Electrical Sound Masking Improvement with 1 head end controller and 35 emitters. Status: Completed | Integrity Networks | $17K | |
| applied Aug 29 | #7104264-FS Fire Sprinkler and Suppression · Trade 112 Head tenant improvement for new demising walls and ceilings. Status: Completed | Not published | $37K |
#7107658-EL Electrical · Electrical Class 2 LV Controls: (20) VAVs relocated and reinstall controls after relocated. (20) Thermostats to be relocated and reinstall in new locations. (1) New VAV with field mounted controls. (1) Exhaust Fan with field mounted controls. (3) New FCUs with field mounted controls. (1) Water Meter with… Status: Completed | Static Energy, Inc | $19.5K | |
| applied Jul 8 | #7094823-FS Fire Sprinkler and Suppression · Trade Tenant improvement involving 61 heads. Existing sprinkler system to be modified for new tenant wall and ceiling layout. Status: Completed | Not published | $18K |
#7106688-EL Electrical · Electrical Demo and reuse existing cable & door hardware for 4 doors. Provide and install access control boards into existing head end Status: Completed | Cochran Inc | $22K | |
#7106638-EL Electrical · Electrical (80) Data Cable Install Status: Completed | Seacom Cabling Inc | $20K | |
| applied Aug 11 | #7100507-EL Electrical · Electrical New and reused notification cover for TI upgrade on the 16th floor. Layout moves notification devices and adds 10 new speakers. Existing circuit will be rerouted for proper coverage of space. Status: Completed | Prime Electric | $13K |
#7104991-EL Electrical · Electrical Class 2 LV Controls:(16) Relocated VAVs and associated thermostats with field reconnect of control wiring. Status: Completed | Static Energy, Inc | $11.5K | |
#7097648-EL Electrical · Electrical Job 8001054: Half floor TI lighting, power, no changes to oneline. Site contact: Matt Peterson (425) 531-8592 [8/27/2025 BGO - Approved partial floor TI Plan Set] [Related Record 7091347-BK] Status: Completed | Prime Electric | $180K | |
| applied Jul 15 | #7096098-ME Mechanical · Trade (1) Added Exhaust Fan. Relocate (16) existing VAVs. New Low pressure duct. Balance of all zones. per plans Status: Completed | Not published | $150K |
#7101655-EL Electrical · Electrical Installation of (163) Category 6 cables to a total of (101) device locations. Installation of (2) 24-Strand fiber optic cables between equipment rooms. Status: Completed | Cochran Inc | $93K | |
#7100283-EL Electrical · Electrical 2501488-Relocated 15th fl VFD and reconnected power/controls. Status: Completed | Titan Electric Inc | $10K | |
#7100273-EL Electrical · Electrical 2501487-Relocated 31st fl VFD and reconnected power/controls Status: Completed | Titan Electric Inc | $10K | |
| applied Apr 3 | #7078580-ME Mechanical · Trade Relocate (25) existing FPT boxes. Install (3) new fan coil units, (3) new fans, and (2) exterior louvers, per plans. Status: Completed | Not published | $600K |
#7098729-EL Electrical · Electrical Pull in 1 fiber Status: Completed | Summit Riser Systems Inc | $2.3K | |
#7097815-EL Electrical · Electrical 2501451-BXP Garage DAS P1-P4-Install conduit, wiring, and 120V outlets for bike and storage cages, including imaging/coring.; [8/4/26 RN Renewal/Reinstatement fee added] Status: Completed | Titan Electric Inc | $8K | |
#7097822-EL Electrical · Electrical Access control and intrusion system installation. Suite 1520. EC job #836327. Status: Completed | EC Electric | $2.8K | |
| applied Jun 12 | #7090977-FS Fire Sprinkler and Suppression · Trade Revision to permit record number 7081037-FS. 9 head sprinkler TI revised per new demising wall locations. Status: Completed | Not published | $4.5K |
#7093515-EL Electrical · Electrical Install (1) enclosure, (1) Access control points, (1) power supply Status: Completed | Cochran Inc | $14.1K | |
#7093527-EL Electrical · Electrical Install (5) access control points, (20) Cat6 drops, (1) enclosure, (1) door board, (1) controller Status: Completed | Cochran Inc | $59.5K | |
| applied Jun 23 | #7092583-CN Addition/Alteration · Building Tenant improvements at existing commercial building subject to field inspection (STFI) Status: Issued | Not published | $50K |
#7089560-EL Electrical · Electrical Structured cabling in TI space. EC job #836247. Status: Completed | EC Electric | $6K | |
| applied Apr 17 | #7081037-FS Fire Sprinkler and Suppression · Trade 11 head tenant improvement for new demising walls. Status: Completed | Not published | $4.5K |
#7088407-EL Electrical · Electrical Replacing desks with like and kind, installing (180) receptacles in new desks and completing panel to panel connections Status: Completed | Cochran Inc. | $3.5K | |
| applied May 14 | #7085951-EL Electrical · Electrical Full floor TI including new power devices, new kitchen with new distribution gear, new lighting and lighting controls, new and rework of existing HVAC electrical connections and new IDF room. [5/21/25 BGO - Approved LVL-18 TI Plan Set] [9/25/25 BGO - Approved Revised Plan Set] Status: Completed | Cochran Inc | $950K |
#7086577-EL Electrical · Electrical install (1) double duplex 15-amp receptacle Install (1) 6-20R printer receptacle & Circuit 2501311 Status: Completed | Titan Electric Inc | $1.5K | |
#7086093-EL Electrical · Electrical Data Cabling in Suite 1530 Status: Completed | Titan Electric Inc | $6.4K | |
#7085286-EL Electrical · Electrical Installing (18) new Cat6A devices. Status: Completed | Cochran Inc | $14.2K | |
#7082902-EL Electrical · Electrical Install (9) customer supplied furniture whips at existing furniture feed locations at walls and floor boxes. Status: Completed | Cochran Inc. | $9.5K | |
#7082266-EL Electrical · Electrical Addition of notification devices in the southeast corner of L16. New demising wall adds a device on each side of the wall for proper coverage. Status: Completed | Titan Electric Inc | $6K | |
#7082137-EL Electrical · Electrical INSTALL 43 NEW CAT6 PLENUM CABLES Status: Completed | Custom Communication Solutions | $10K | |
#7079628-EL Electrical · Electrical Titan Job#2573011 - Small TI of 16th Floor corridors and elevator lobby including lighting and FA cabling. Status: Completed | Titan Electric Inc | $33.6K | |
| applied Feb 25 | #7071736-ME Mechanical · Trade Rework (10) GRDs for new wall layout, rebalance (4) VAVs, re-duct existing EF and add charcoal filter. per plans Status: Completed | Not published | $50K |
#7077838-EL Electrical · Electrical Installation of (1) controller and (1) card reader/AC point. Status: Completed | Cochran Inc | $16.9K | |
| applied Feb 18 | #7070787-FS Fire Sprinkler and Suppression · Trade TENANT IMPROVEMENT - Add and relocate sprinklers for TI walls and ceilings Status: Completed | Patriot Fire Protection Inc | $12.9K |
#7075138-EL Electrical · Electrical Furnish and Install 2 quads ~3ft from the floor, ~4ft apart from each other on the front wall 1 data port (next to one of the power outlets). Power to come off of existing circuits within 25' of the wall. Status: Completed | Tapps Electric | $2K | |
#7073552-EL Electrical · Electrical Joint venture between Convergint and Titan Electric. Installing six or less notification devices. Status: Completed | Not published | $390 | |
#7072603-EL Electrical · Electrical Installation of (23) Card Readers Status: Completed | Cochran Inc | $16.1K | |
#7059003-EL Electrical · Electrical Job #2401797 - Installing (5) head pendant lights Status: Completed | Titan Electric Inc | $4.5K | |
| applied Oct 16 | #7047361-CN Addition/Alteration · Building Construct tenant improvements to office space at level 26 of existing commercial building per plan Status: Completed | Not published | $40K |
#7053905-EL Electrical · Electrical low-voltage WIRE PULL (Floor 26: 13 rooms with cat6 network cabling) Status: Completed | Advantage Audio Visual Systems, LLC | $27.6K |
In Seattle, biggest first.