Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Seattle, WA
Multifamily Elevator, Hvac/Mechanical work permitted August 18, 2025, with 4 permits through February 9, 2026, declaring $522,910 of work. Contractor on record: Vertical Dimensions.
Traction Elevator Modernization including replacement of existing controller, machine, fixtures, door operating device and door detection device. EQP-SI-05158 / EQP-CY-02369 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1)
Seattle permit records name Vertical Dimensions and 16d LLC as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Aug 18 – Feb 9, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Feb 9 | #7128520-CY Conveyance · Trade |
Commercial and multifamily, biggest first.
Elevator cab alterations includes: WALL PANELS, HANDRAILS, CEILING with LIGHTING, CLADDING. EQP-SI-05158 / EQP-CY-02369 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Weight coming out: 651 lbs. Weight going in: 635 lbs.
Status: Issued
| Vertical Dimensions |
| $26K |
| applied Dec 5 | #7117787-CY Conveyance · Trade Traction Elevator Modernization including replacement of existing controller, machine, fixtures, door operating device and door detection device. EQP-SI-05158 / EQP-CY-02369 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Not published | $496K |
| applied Sep 30 | #7102202-ME Mechanical · Trade For the purpose of elevator modernization: Replace existing split unit with new in existing elevator machine room and adjacent rooftop Status: Completed | Not published | $1.1K |
| applied Aug 18 | #7102206-RF Refrigeration · Trade For the purpose of elevator modernization: Refrigeration for replacement unit on mechanical permit 7102202-ME Status: Completed | 16d LLC | $1.1K |
In Seattle, biggest first.