Get Procommercial project · Seattle, WA
Commercial Electrical, Hvac/Mechanical work permitted November 19, 2024, with 13 permits through September 25, 2026, declaring $137,234 of work. Contractor on record: Macdonald Miller Facility Solutions LLC.
REPLACE (3) HEAT PUMP SPLIT SYSTEMS IN THE SAME LOCATION WITH SAME OR APPROVED MAKE AND MODEL, PER PLAN.
Seattle permit records name Macdonald Miller Facility Solutions LLC, Cochran Inc and Pacific Power Group as the contractors on this project, among 9 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
13 permits issued Nov 19 – Sep 25, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7164414-EL
Electrical · Electrical
Modification to existing fire alarm system. Installation of (6) new devices on first floor of suite 1307.
Status: Issued
| Johnson Controls Fire Protection |
| — |
| applied Jul 23 | #7153583-ME Mechanical · Trade REPLACE (3) HEAT PUMP SPLIT SYSTEMS IN THE SAME LOCATION WITH SAME OR APPROVED MAKE AND MODEL, PER PLAN. Status: Completed | Macdonald Miller Facility Solutions LLC | $94.5K |
#7158701-EL Electrical · Electrical Installation of (1) 24-strand fiber between 6th floor MDF and Hughes Tower MDF via skybridge. Status: Issued | Cochran Inc | — |
#7158043-EL Electrical · Electrical Replace existing disconnects, perform electrical disconnect and make-safe of units, run new wiring using existing conduit, and perform electrical reconnect once new units are installed. Status: Issued | Macdonald Miller Facility Solutions LLC | — |
#7157847-EL Electrical · Electrical INSTALL CONDUIT PATHWAY FOR CAMPUS INTERCONNECTION. PROJECT#530960-01 Status: Issued | Cochran Inc | — |
| applied Jul 16 | #7153313-RF Refrigeration · Trade REPLACE (3) HEAT PUMP SPLIT SYSTEMS IN THE SAME LOCATION WITH SAME OR APPROVED MAKE AND MODEL. Status: Completed | Macdonald Miller Facility Solutions LLC | — |
#7150428-EL Electrical · Electrical Load bank testing of emergency back up generator - 127624 Status: Completed | Pacific Power Group | — |
#7146689-EL Electrical · Electrical Load Bank Test - SEQ #7318383 Status: Completed | Sequoyah Electric LLC | — |
#7112780-EL Electrical · Electrical Extend IT room #620 circuitry for another the access control (access control provided by others) Status: Completed | Defining Energy NW | $650 |
#7101649-EL Electrical · Electrical Installation of approximately (80) Cat6A cables for new Optum suite TI. Status: Completed | Structured Communications | $22.7K |
#7100256-EL Electrical · Electrical LOAD BANK TESTING ON ELECTRIC BACK UP GENERATOR - SR00115818 Status: Completed | Pacific Power Group | $450 |
#7096362-EL Electrical · Electrical Installation of a Kantech/Hattrix Access Control System. Status: Completed | Protection &Communications Inc | $13K |
#7057092-EL Electrical · Electrical Replace light fixture tied to existing circuit - extend existing circuit to power exhaust fan - Pathway and backbox to card reader - Remove and replace wall sconce Status: Completed | Tapps Electric | $6K |
In Seattle, biggest first.