Commercial Electrical, Elevator work permitted May 14, 2025, with 5 permits through May 12, 2026, declaring $380,265 of work. Contractor on record: 16d LLC.
EQP-SI-05466 / EQP-CY-02886 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Elevator modernization with new components as follows: Imperial 527 gearless machine (retain existing machine supports), RM-H controller, Glide P door operator, COP, hall fixtures, Otis One 2-way voice/video/text, Optiguard 3D door detector, C7063E governor, in car card reader security, hall call security keyswitch at bottom floor (existing), lobby panel in fire command center
Seattle permit records name 16d LLC, Otis Elevator Company and A1 electrical Solutions LLC as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued May 14 – May 12, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
| applied May 6 | #7141749-EL Electrical · Electrical @ WATERMARK TOWER, REPLACE ELEVATOR DISCONNECTS. RELOCATE ELEVATOR UTILIZATION CIRCUITS OCPD TO MACHINE ROOM PANEL. UPGRADE MACH ROOM AND PIT LIGHTS TO LED. [5/12/26 BGO - Approved Elevator Modernization Plan Set] Status: Issued | 16d LLC | $17.2K |
#7140352-EL Electrical · Electrical For the purpose of elevator modernization: Install relays and smoke in existing elevator machine room Status: Issued | 16d LLC | — | |
| applied Jan 7 | #7123081-CY Conveyance · Trade EQP-SI-05466 / EQP-CY-02886 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Elevator modernization with new components as follows: Imperial 527 gearless machine (retain existing machine supports), RM-H controller, Glide P door operator, COP, hall fixtures, Otis One 2-way voice/video/text,… Status: Issued | Otis Elevator Company | $361K |
| applied Jan 7 | #7123083-CY Conveyance · Trade EQP-SI-05466 / EQP-CY-02887 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Elevator modernization with new components as follows: Imperial 527 gearless machine (retain existing machine supports), RM-H controller, Glide P door operator, COP, hall fixtures, Otis One 2-way voice/video/text,… Status: Issued | Otis Elevator Company | $361K |
#7085905-EL Electrical · Electrical add, (6) wall sconces, demo existing cans and add new lobby chandelier Status: Completed | A1 electrical Solutions LLC | $2K |
In Seattle, biggest first.