Get Procommercial project · Seattle, WA
Commercial Electrical, Hvac/Mechanical work permitted July 1, 2025, with 6 permits through October 15, 2026, declaring $49,700 of work. Contractor on record: Kliemann Bros Heating & A/C.
Provide electrical disconnect of old fire pump controller and reconnect of new controller. Controller provided and installed by others. OTC permit pulled 7147678-EL [10 15 26 BGO - Approved Plan Set]
Seattle permit records name Kliemann Bros Heating & A/C, AAA Fire Protection and Nelson Electric Incorporated as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractor6 permits issued Jul 1 – Oct 15, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 31 | #7160555-EL Electrical · Electrical Provide electrical disconnect of old fire pump controller and reconnect of new controller. Controller provided and installed by others. OTC permit pulled 7147678-EL [10 15 26 BGO - Approved Plan Set] Status: Ready For Issuance | Contractor with Pro | $30K |
#7160836-EL Electrical · Electrical Replace deficient SK 5395 NAC power supply with a new Honeywell HPF-PS6 power supply. Status: Issued | AAA Fire Protection | — | |
#7147678-EL Electrical · Electrical Provide electrical disconnect and reconnect for fire pump controller replacement. Controller provided and installed by others Status: Issued | Nelson Electric Incorporated | — | |
| applied Aug 27 | #7096433-ME Mechanical · Trade Replace the existing ventilation system using outside air to cool the elevator equipment with a dedicated 18,000 BTU/h mini split system, per plan. Status: Completed | Kliemann Bros Heating & A/C | $10K |
| applied Jul 16 | #7096207-RF Refrigeration · Trade As part of the elevator renovation project, we will be replacing the existing ventilation system using outside air to cool the elevator equipment with a dedicated 18,000 BTU/h mini split system for the elevator equipment room only as per the general contractor's equipment load calculations. The… Status: Completed | Kliemann Bros Heating & A/C | $10K |
#7094123-EL Electrical · Electrical Electrical upgrade to meet elevator code for elevator modernization. Status: Completed | Merit Electric, Inc. | $9.7K |
In Seattle, biggest first.