Commercial Electrical, Elevator, Fire Protection work permitted November 6, 2024, with 8 permits through July 8, 2026, declaring $297,839 of work. Contractor on record: Valley Electric Co. Of Mount Vernon Inc.
Temp Use Permit 7005485-CY (Original Installation Permit) 60-day temp use permit valid from date signed by City of Seattle elevator inspector. Must have two-way communication with operator at all times.
Seattle permit records name Valley Electric Co. Of Mount Vernon Inc, Schindler Elevator Corporation and BCE Specialties as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
8 permits issued Nov 6 – Jul 8, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#7151963-EL Electrical · Electrical Install (1) 20A Circuit for a flow meter in the beverage storage room, fed from electrical panel in the Mechanical room next door. SEQ #7318510 Status: Completed | Sequoyah Electric LLC | — | |
#7150021-EL Electrical · Electrical VE #10004217 REPLACING 7 LIGHT FIXTURES Status: Completed | Valley Electric Co. Of Mount Vernon Inc | — | |
#7142522-EL Electrical · Electrical VE # 10004200 ADDING ELECTRICAL OUTLETS FOR OWNER Status: Completed | Valley Electric Co. Of Mount Vernon Inc | — | |
| applied Feb 12 | #7070088-CY Conveyance · Trade Temp Use Permit 7005485-CY (Original Installation Permit) 60-day temp use permit valid from date signed by City of Seattle elevator inspector. Must have two-way communication with operator at all times. Status: Completed | Schindler Elevator Corporation | $256K |
| applied Dec 18 | #7061616-CY Conveyance · Trade Temp Use Permit Car #3 7005485-CY (Original Installation Permit) 60-day temp use permit valid from date signed by City of Seattle elevator inspector. Must have two-way communication with operator at all times. Status: Issued | Schindler Elevator Corporation | $256K |
| applied Nov 19 | #7053897-CY Conveyance · Trade Installation of aesthetic cab interior components for elevator cab: Suspd ceiling with FRPB substrate, pwd coated steel ceiling facing, LED downlights, Int side wall panels with FRPB substrate, bronze facing, Base, Frieze & Reveals made out of bronze, Solid wood handrails with flame stop applied,… Status: Completed | BCE Specialties | $38.9K |
| applied Nov 19 | #7053898-CY Conveyance · Trade Installation of aesthetic cab interior components for elevator cab: Suspended ceiling with FRPB substrate, powder coated steel ceiling facing, LED downlights, Interior side wall panels with FRPB substrate, bronze facing, Base, Frieze & Reveals made out of bronze, Solid wood handrails with flame… Status: Completed | BCE Specialties | $38.9K |
| applied Oct 29 | #7053654-FS Fire Sprinkler and Suppression · Trade Installation of a UL 300 Compliant Kitchen Hood Suppression System with overlapping coverage of kitchen appliances Status: Completed | Alexander Gow Fire Equipment | $3.4K |