Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Francisco, CA
Commercial General Building, Sign work permitted May 16, 2025, with 21 permits through September 1, 2026, declaring $25,577,039 of work. Contractor on record: Truebeck Construction.
horizontal infill of (e) terraces at levels 2-5, (n) marquee. architectural and mep core and shell updates at all floors, and (n) interior & exterior assembly amenity spaces at level 6. soft demo, interior tenant improvements, and voluntary seismic upgrade to be done under separate permits.
San Francisco permit records name Truebeck Construction, Corporate Sign Systems and Johnson Controls Fire as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
21 permits issued May 16 – Sep 1, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
| applied Aug 14 | #202608146643 otc alterations permit provide and install a new elevator lobby emergency communication system (2-way comm. system) ref pa#202511109279 and fire-26-20. Status: Issued | Johnson Controls Fire | $27.3K |
| applied May 27 | #202605271940 otc alterations permit 6/fl- revisoin 202410173107 to include adding guardrail to 6th floor roof deck plan north parapet. in response to as built discovery that the parapet is less than 42" at roof deck Status: Complete | Truebeck Construction | — |
| applied Apr 7 | #202604079048 otc alterations permit revision to 202410082583 and 202507020012. update 5 columns at level 1 from frp strengthening to steel tube strengthening. Status: Complete | Truebeck Construction | — |
| applied Mar 5 | #202603057022 otc alterations permit install (40) evacuation maps on all levels Status: Issued | Corporate Sign Systems | $19.2K |
| applied Mar 5 | #202603057016 sign - erect fabricate and install (1) internally face illuminated canopy sign. connecting to power source w/ dedicated 20amp circuit, and astronomical timer Status: Issued | Corporate Sign Systems | $12K |
| applied Mar 5 | #202603057018 sign - erect fabricate and install (1) non-illuminated wall mounted sign. Status: Issued | Corporate Sign Systems | $2K |
| applied Mar 11 | #202603117374 otc alterations permit defferred green living wall submission associated with approved pa #202410173107 Status: Complete | Truebeck Construction | $20K |
| applied Dec 8 | #202511210162 additions alterations or repairs defferred exterior metal framing assocated with approved pa 202410173107. Status: Complete | Truebeck Construction | $10K |
| applied Nov 2 | #202510207688 additions alterations or repairs installation of new errc sytem.fire only.reference bpa#202410173107. Status: Issued | Bobcomm Llc Dba Pacific Das Llc. | $120K |
| applied Aug 29 | #202508153157 additions alterations or repairs defferred curtainwall: structural only submission assocated with approved pa 202410173107 Status: Complete | Truebeck Construction | — |
| applied Dec 12 | #202512121693 otc alterations permit phase 3 - 1/f & 6/f and core: fire sprinkler for t.i. 202410173107. Status: Complete | Golden Bear Fire Protect. | $129K |
| applied Dec 12 | #202512121692 otc alterations permit 4/f: fire sprinkler for t.i. 202506239258. Status: Complete | Golden Bear Fire Protect. | $39K |
| applied Jul 10 | #202507020012 additions alterations or repairs deferred frp structural only submission associated with approved pa 202410082583. Status: Complete | Truebeck Construction | $20K |
| applied Nov 3 | #202511038796 otc alterations permit windscreen structural only submission associated with 202410173107 Status: Complete | Truebeck Construction | — |
| applied Nov 10 | #202511109279 otc alterations permit fire alarm system replacement, at owners request due to obsolecence. new 4100 es fire alarm control panel and devices. ref pa #2024911081130. Status: Complete | Johnson Controls Fire | $160K |
| applied Aug 15 | #202508153215 otc alterations permit mech and electrial upgrades install (n) ashp heating , hot water chiler and new panel hr Status: Complete | Truebeck Construction | $2.5M |
| applied Jun 23 | #202506239258 otc alterations permit 4th floor: tenant improvements includes new non-load bearing partitions, doors, ceiling, and finishes. mep included. Status: Complete | Truebeck Construction | $2.7M |
| applied Nov 14 | #202410173107 additions alterations or repairs horizontal infill of (e) terraces at levels 2-5, (n) marquee. architectural and mep core and shell updates at all floors, and (n) interior & exterior assembly amenity spaces at level 6. soft demo, interior tenant improvements, and voluntary seismic upgrade to be done under separate permits. Status: Complete | Truebeck Construction | $13.3M |
| applied Jul 18 | #202507181148 otc alterations permit to obtain final inspection for work approved under pa#201804206958. all work is complete. Status: Issued | Apex Site Solutions Inc | — |
| applied May 29 | #202505297523 otc alterations permit revision to pa# 202410082583: misc structural updates. Status: Complete | Truebeck Construction | — |
| applied Oct 8 | #202410082583 additions alterations or repairs phase 2: voluntary structural seismic upgrade on all floors: soft demo and architecture under separate permit. see 202410173107. Status: Complete | Truebeck Construction | $6.5M |
In San Francisco, biggest first.