Commercial General Building, Sign work permitted November 5, 2024, with 40 permits through October 15, 2026, declaring $35,645,337 of work. Contractor on record: Gci, Inc.
priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12,interior demolition of interior,including portion of 2nd fl structural slab for(n) stair opening,construction of(n)paritions doors,ceilings,finishes,fixtures.
San Francisco permit records name Gci, Inc, Principal Builders Inc. and Sabah International Incorporated as the contractors on this project, among 11 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
40 permits issued Nov 5 – Oct 15, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 29 | #202609298752 otc alterations permit revision to bpa# 202510248119 alteration anchorage detail for installation of phone booths at level 5 & 6 Status: Issued | Contractor with Pro | $10K |
| applied Sep 14 | #202609148077 otc alterations permit 12th floor- structural only permit to show anchorage of idf racks. scope also includs removal of seismic bracing requirement for ductwork shown on pa#2026-0312-7419. Status: Issued | Gci, Inc | — |
| applied Sep 11 | #202609117968 otc alterations permit new lobby level security improvements-installing turnstiles Status: Issued | Richlen Construction | $250K |
| applied Jul 17 | #202607175186 otc alterations permit four evacuation maps on 6th floor. 27" x 18" Status: Issued | Prima Acquire Inc Dba Lahue And Associat | $1.9K |
| applied Jun 25 | #202606253891 otc alterations permit suite 400: reconfigure existing ductwork, ceiling diffusers, and grilles. provided vav boxes and suspended transfer air fan. Status: Issued | Richlen Construction | $75K |
| applied Jun 25 | #202606253903 otc alterations permit deferred electrical for 4th floor suite 400 office ti under permit 202604028757. Status: Issued | Richlen Construction | $175K |
| applied Apr 29 | #202604290326 otc alterations permit ste 770: 2 new phone booths in existing office. new outlets for phone booths Status: Issued | Skyline Construction | $10K |
| applied Dec 31 | #202512313144 otc alterations permit demolition of structural deck between level 5 and 6. construct new stair. Status: Issued | Gci, Inc | $700K |
| applied Feb 25 | #202602256484 otc alterations permit ste 1200 interior demo only - tenant readiness. ab-017 applies Status: Complete | Gci, Inc | $78K |
| applied May 21 | #202605211681 otc alterations permit 10th fl l- ref pa 202512222392 there is an existing 2-way communication system back bone installed in the building. provide 2 way communication system call station Status: Issued | Sabah International Incorporated | $9K |
| applied May 21 | #202605211682 otc alterations permit 11th fl l- ref pa 202512151826 there is an existing 2-way communication system back bone installed in the building. provide 2 way communication system call station Status: Complete | Sabah International Incorporated | $9K |
| applied Apr 16 | #202604169579 otc alterations permit revision to 202512222392 10th/f & 202512151826 11th/f: showing shaft due to unforseen conditions, power & lighting refiguration. lighting & ceiling modification, add emergency release buttom at elevator lobby doors Status: Complete | Principal Builders Inc. | — |
| applied Apr 20 | #202604209752 otc alterations permit 10th & 11th fl - evac maps Status: Complete | Principal Builders Inc. | $958 |
| applied Mar 12 | #202603127419 otc alterations permit 12th fl - interior ti in an existing building new construction of new partitions, case work & mep upgrades; millwork on 12th fl Status: Issued | Gci, Inc | $3.5M |
| applied Dec 9 | #202512091312 otc alterations permit 5/fl-(n) interior ti to include mechanical and electrical . structrual for movable wall. includes mep work Status: Issued | Gci, Inc | $3.9M |
| applied Apr 2 | #202604028757 otc alterations permit 4th floor: limited interior demo & construction of non-strucutral elements ~ partitions - finishes, electrical outlets, ceiling treatments, lighting & switches & restroom upgrades. scope does not affect fixture quantities, occ load or p.o.t. no exterior work. Status: Issued | Richlen Construction | $238K |
| applied Dec 9 | #202512091310 otc alterations permit 6th fl - new construction, mech & elec & structural header for movable walls; power, lighting & signal; install new 37 cooling units, 1 new wshp, new duct Status: Issued | Gci, Inc | $6.2M |
| applied Dec 22 | #202512222392 otc alterations permit 10/f. t.i (n) non structural partitions, ceiling, finishes, fixtures. demo under pa# 202511069080. Status: Complete | Principal Builders Inc. | $3.9M |
| applied Dec 15 | #202512151826 otc alterations permit 11/fl- ti demo (e) and build (n) partitions (non-structural) accoustical/ceiling, finishes, millwork (n) cafe Status: Complete | Principal Builders Inc. | $4M |
| applied Jan 13 | #202601133754 sign - erect to erect projecting double face electrical sign Status: Issued | Mc Millan Electric | $10K |
| applied Nov 6 | #202511069080 otc alterations permit 10/fl: demo existing non structured partitions, ceilings, lights fixtures, millwork and finishes per ab-017 Status: Complete | Principal Builders Inc. | $176K |
| applied Nov 6 | #202511069077 otc alterations permit 11/f: demo at non-structural partitions, ceilings, lights fixtures, millwork and finishes. per ab017 Status: Complete | Principal Builders Inc. | $179K |
| applied Oct 24 | #202510248119 otc alterations permit demo of existing partitions ceilings and associated mep & finishes on 5th and 6th floor. Status: Issued | Gci, Inc | $290K |
| applied Sep 9 | #202508203512 additions alterations or repairs priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12, deferred submittal for pa202504043725 to construct an indoor climbing wall. Status: Complete | Gci, Inc | $70.8K |
| applied Aug 26 | #202508263873 otc alterations permit 1&2/fl-this is a fire alarm tenant improvement. demo existing notification appliances from (e) circuit as shown on plans. ref#: 202504043725 Status: Complete | Sabah International Incorporated | $99.2K |
| applied Jul 25 | #202507251621 otc alterations permit add & relocating sprinklers to new ceiling and wall configuration. re-locate 77 pendants, add 24 pendants, add 6 upright heads. ref pa# 202504043725 Status: Complete | Pioneer Fire Inc. | $91.3K |
| applied Apr 15 | #202504043725 additions alterations or repairs priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12,interior demolition of interior,including portion of 2nd fl structural slab for(n) stair opening,construction of(n)paritions doors,ceilings,finishes,fixtures. Status: Complete | Gci, Inc | $10M |
| applied Feb 4 | #202502049677 otc alterations permit 1st & 2nd/f: interior demo per sfdbi ab-107. interior demolition of non-structural elements including but not limited to: interior partitions, doors, finishes, ceilings, lighting, mechanical ducts and equipment, outlets and switches. Status: Complete | Gci, Inc | $427K |
| applied Feb 5 | #202502059708 otc alterations permit 16/fl: modification to existing fire alarm system on the 16th floor. add (2) new speakers/ strobes -ceilng mounted. add (4) strobe -ceiling mounted. ref: pa#2025-0106-7752 Status: Complete | Sabah International Incorporated | $4.4K |
| applied Feb 4 | #202502049614 otc alterations permit 16 fl: relocate (37) pendents, convert (17) pendents to uprights. ref pa 202501067752 Status: Complete | Pioneer Fire Inc. | $27.1K |
| applied Jan 16 | #202501168433 otc alterations permit existing fire sprinkler system tenant improvements add 1 fire sprinkler ref pa# 2024-1015-2993 Status: Complete | Anderson, Rowe & Buckley, Inc. | $621 |
| applied Jan 6 | #202501067752 otc alterations permit 16th floor: partial floor and ceiling demolition of existing tenant space. new interior partitios, ceilings, and finishes. mechanical and electrical work included. Status: Complete | Novo Construction Inc | $1.1M |
| applied Dec 17 | #202412176954 otc alterations permit 9th fl - add 1 sprinkler, existing fire sprinkler system tenant improvement ref pa 202410152989 Status: Complete | Anderson, Rowe & Buckley, Inc. | $600 |
| applied Nov 14 | #202411145014 otc alterations permit 9+14/fl- ref 202410152989 and 202410152993- defered electrical work Status: Issued | Principal Builders Inc. | $13.4K |
| applied Nov 25 | #202411255695 otc alterations permit 9/f: deferred submital to pa# 202410152989 for structural anchorage of relocated phone booth. Status: Issued | Principal Builders Inc. | — |
| applied Oct 15 | #202410152989 otc alterations permit 9/f: ti - selective demo of non-load bearing walls and doors.l new gyp soffit and millwork in break 912. new millwork in (e) mothers room 905. selective demo of (e) finishes and finish alterations to (e) office. Status: Issued | Principal Builders Inc. | $50K |
| applied Oct 15 | #202410152993 otc alterations permit 14/f: new gyp soffit and millwork in break 1415. selective demo of (e) finishes and finish updates to the (e) office. Status: Issued | Principal Builders Inc. | $60K |
| applied Nov 8 | #202411084662 otc alterations permit 5th floor. fire sprinkler permit. relocate 7 and delete 1 fire sprinkler in suite 520 Status: Complete | R L H Fire Protection Inc | $2.5K |
| applied Nov 5 | #202411054387 otc alterations permit 1st fl - fire alarm ti - new initiating devices will be tied to the existing slc circuit. new notification appliances will be connected to existing power supply with existing circuit. ref pa 202403147834 Status: Complete | Sabah International Incorporated | $24.8K |
| applied Nov 5 | #202411054390 otc alterations permit 5th fl - fire alarm ti - new ceiling strobes will be tied to the existing nac appliances and will be connected to the existing power supply using the existing circuit ref pa 202410032275 Status: Complete | Sabah International Incorporated | $18.4K |