Commercial General Building work permitted March 21, 2025, with 22 permits through October 6, 2026, declaring $12,826,827 of work. Contractor on record: Bilcor Inc.
Get new commercial permits near 94107 or San Francisco, free weekly email
4/fl- ti work includes construction of non load bearing partitions, (n) ceilings, carpet and paint. replace finishes in kind for the (e) bathrooms.
San Francisco permit records name Bilcor Inc, M C S Construction Services and Swinerton Builders as the contractors on this project, among 8 contractors in all.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractor22 permits issued Mar 21 – Oct 6, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
| applied Jun 25 | #202606253887 otc alterations permit 8th * 9th fl - install of modular phone booths in an existing office fls 8 & 9 existing occupancy are not affected by this work. no demo mep or security work included. structural work included Status: Complete | Contractor with Pro | $120K |
| applied Aug 18 | #202608186737 otc alterations permit 6th & 7th fl - install 4 new call station bath 2400-808nspm w/mushroom button (flush mount); install 4 call station signage; 2 way ecs dominant backbone infrastructure pa 202102044083; architectural ref pa 202604028744 Status: Complete | Bilcor Inc | $24K |
| applied Jul 21 | #202607215312 otc alterations permit deferred mech+ elec permit. ref 202604028744 - mech furn+ install new reheat vav box, new cooling only vav boxes , new fsd, transfer boot, heating hot water pipes, ductwork + air dist. relocate sound boot. elect: new power + signal devices throught the space, new t 24. lightings and control. Status: Complete | M C S Construction Services | $1.5M |
| applied Jun 23 | #202606233699 otc alterations permit 4/fl- ref 202603036842 - evacuation maps total of 6 maps Status: Complete | Swinerton Builders | $1K |
| applied May 21 | #202605211675 otc alterations permit ref to pa 202503051624 landlord improvements to penthouse roof deck, restroom & lobbies for indoor & outdoor lighting & power systems. connecting power to new r relocated light fixtures, power outlets & tenant equipment. all work consists of making connections from base building existing and/ Status: Complete | Gci, Inc | $20K |
| applied Apr 2 | #202604028744 otc alterations permit floor 6 & 7: demolition of non-structural partitions and doors. new construction includes doors, partitions, ceilings, lighting, plumbing, and finishes. mep and fls deferred. Status: Complete | M C S Construction Services | $2.8M |
| applied May 28 | #202605282042 otc alterations permit 4th floor: install (2) new call station rath 2400-808nspm w/ mushroom button(flush mount). install (2) call station signage. two-way els permanent backbone infrastructure permit #2021-0204-4083. arch. ref #2026-0303-6842 Status: Complete | Bilcor Inc | $12K |
| applied Apr 9 | #202604099149 otc alterations permit 4/fl- ref 202603036842 - deferred mep Status: Complete | Swinerton Builders | $800K |
| applied Mar 3 | #202603036842 otc alterations permit 4/fl- ti work includes construction of non load bearing partitions, (n) ceilings, carpet and paint. replace finishes in kind for the (e) bathrooms. Status: Complete | Swinerton Builders | $4.1M |
| applied Jan 13 | #202601133705 otc alterations permit 1st fl - demo 2 existing sprinkler heads under drip pan that is being removed in the server room Status: Complete | Everon Llc | $12K |
| applied Jan 20 | #202601204143 otc alterations permit suite 145: demolition of concrete wall in front of glass wall. removal of wall mounted cameras and clocks. removal of fcu's above ceilings etc. ab-017 exception to requirements for disabled access to vacant spaces. suite shall remain unoccupied until tenant improvement is filed. Status: Complete | Mai Construction Inc. | $250K |
| applied Dec 30 | #202512302992 otc alterations permit 4/f: interior demo per ab-017 in existing 4th floor office tenant space. Status: Issued | Swinerton Builders | $182K |
| applied Sep 22 | #202509225838 otc alterations permit 11th/fl and 13th/fl: provide 2 new relays devices for access control panels door release on the 11th/13thth floor. Status: Complete | Johnson Controls Fire | $1.2K |
| applied Aug 26 | #202508263879 otc alterations permit 13th fl- install 2 new call station rath 2400-808nspm w/ mushroom button (plush mount). install 2 call station signage. two way ecs permanent backbone infrastructure pa 2021-0204-4083 Status: Complete | Bilcor Inc | $2.2K |
| applied Jul 31 | #202507312036 otc alterations permit ref pa #202503051624: fls modification on the roof: add 5 speaker/strobes; 1 replace speaker/strobes; 2 strobes add; 1 nac extender add; add 1 amplifier and 1 smoke detector add. Status: Complete | Johnson Controls Fire | $15K |
| applied Jul 7 | #202507070216 otc alterations permit install (1) new call station w/ mushroom button install (1) call station signage 2 way ecs backbone 2021-0204-4083 arch ti 2025-0310-1876 f/a ref 2025-0506-5891 Status: Complete | Bilcor Inc | $10K |
| applied May 6 | #202505065891 otc alterations permit 5th/f modification: add 1 nac expander, 3 relays, 47 speaker/strobes, 2 dect detecters. ref to t.i. pa# 202503101876 Status: Complete | Johnson Controls Fire | $53K |
| applied May 23 | #202505237177 otc alterations permit deferred mechanical and electrical work under office tenant improvement project- pa #202503101876. note: no exterior work. Status: Complete | M C S Construction Services | $595K |
| applied May 14 | #202505146407 otc alterations permit 15th fl rr & elevator lobby ref pa #2025-0305-1624: convert (4) uprights to pendents remove (1) upright Status: Issued | Pioneer Fire Inc. | $3.1K |
| applied Mar 5 | #202503051624 otc alterations permit 15th floor. renovation of existing roof deck, including new convenience restroom and new elevator lobby finishes, select demo and new partitions, ceilings, doors, finishes. installation of new shade structure and planting beds. mep deferred Status: Complete | Gci, Inc | $790K |
| applied Mar 26 | #202503263034 otc alterations permit relocate 133 pendents, convert 129 pendents to uprights, add 8 pendents, 3 uprights gci 202503101876 Status: Complete | Pioneer Fire Inc. | $5K |
| applied Mar 10 | #202503101876 otc alterations permit 5th fl/: scope of work on the 5th floor shall consist of demolition of non structural interior partitions, doors, finishes. new work to include partitions, doors, finishes, millork, ceiling and lighting. (e) restrooms to be upgraded. mep ad fire/safety are deferred submittals. Status: Complete | M C S Construction Services | $1.6M |
In San Francisco, biggest first.