Issued Mar 25 · 4 permits
$10.5M
to construct a 5-story, type 1b, mixed use building with office/lab use at levels 1-4 and a residential dwelling unit at level 5. **comply w/ maher ord# 155-13, route to dph**
Get ProEvery project in every city · from $79/mo
Get ProMonthly permit report
By declared value.
Issued Mar 25 · 4 permits
$10.5M
to construct a 5-story, type 1b, mixed use building with office/lab use at levels 1-4 and a residential dwelling unit at level 5. **comply w/ maher ord# 155-13, route to dph**
Issued Mar 12
$9.3M
to erect 7 stories, no basement, type iii-a over type i podium, 29 units multi-family residential and retail building.
Issued Mar 10 · 2 permits
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
$1.6M
to comply with nov#202302977. includes: repair foundation wall in the basement of the bldg including addition of foundation footings, installation new concrete wall at basement…
Issued Mar 27
$1.3M
fire alarm system migration @ the kaiser(cn31-03)medical office bldg;migrant to (n) equipment, 1 control panel,11 pull stations, 7 modules,75 smoke detectors,15 heat detectors,43…
Issued Mar 28 · 3 permits
$1.3M
1/f & mezzanine: selective demo of interior non-structural partitions, doors, millwork & finishes. construction of interior non-structural partitions, floor, wall & ceiling…
Issued Mar 27
$1M
stucco repairs: stucco texture, color, and control joint locations/types are to be replaced in kind. install hard flashing on (e) windows common area.
Issued Mar 4
$1M
voluntary structural improvement @ 1st & basement levels.(n) bldg storage @ basement. add ada ramp inside storefront in compliance w/ abe program,install 2 (n) unisex restrm, 1…
Issued Mar 11
$984K
stucco repairs: stucco texture, color, and control joint locations/types are to be replaced in kind. install hard flashing on (e) windows common area.
Issued Mar 25 · 6 permits
$563K
deferred mep for pa#202410243677. replace 1 (e) lightwell window glazing only
Issued Mar 21
$451K
install ev charging, 16 posts, 4 cabinets, 6 lights, 1 switch board. 4 trash bins, 1 van access sign, 7 drilled bolts, 2 bolt down , 1 wifi repainter.
Email me next month’s report
Free: San Francisco’s October 2026 report when it’s out, and the week’s new commercial permits every Monday.
Get new San Francisco projects the day they’re permitted
Same-day email alerts, contractor names, filters and CSV export.
See plansOther months: September 2026 · August 2026 · July 2026 · June 2026 · May 2026 · April 2026