Issued Aug 13 · 4 permits
$22.8M
The Scope of Work will include renovation in both the Bread and Bone Buildings and includes a new freezer addition. The Scope of Work will also include the addition of (4) silos…
Get ProEvery project in every city · from $33/mo
Get ProMonthly permit report
By declared value.
Issued Aug 13 · 4 permits
$22.8M
The Scope of Work will include renovation in both the Bread and Bone Buildings and includes a new freezer addition. The Scope of Work will also include the addition of (4) silos…
Issued Aug 10 · 6 permits
$9.3M
Buffalo Central Terminal Capital Improvements - Phase 2. Project to include interior renovation to a portion of the interior concourse and entry lobby finishes and MEP systems.…
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
Issued Aug 20 · 20 permits
$7.5M
*** Avant Building *** Interior renovations of rooms and common areas for floors 1- 6 of an existing hotel (Hilton). Plumbing & electrical work limited to fixtures only. ***…
Issued Aug 5 · 2 permits
$6.5M
Buffalo Urban Development Corp. (BUDC) is upgrading the existing electrical substation. Work includes substation upgrade, two new switchgear enclosures, three (3) electrical…
Issued Aug 4 · 5 permits
$5.4M
Description: Electrical renovations to Lasalle Park ( Ralph Wilson Centennial Park) for phase I and phase IA of construction. Installation of new road, pedestrian, and sports…
Issued Aug 20 · 6 permits
$5.1M
The project is located within the existing Conventus building at 1001 Main Street Buffalo, New York. The tenant will occupy two suites on the first floor of the building, at the…
Issued Aug 28 · 4 permits
$1.3M
Parcel combination of ( 1382, 1394 & 1398 Niagara ) to be combined as one parcel for the new construction of a ( 13,000 GSF ) 1-story Flex Building type structure for business…
Issued Aug 27
$1.3M
Associated electrical and instrumentation work for the rehabilitation of the (4) existing pumps, replacement of (4) VFD's.
Issued Aug 20 · 3 permits
$1.1M
*** Change of Use / Use *** Change of use to convert existing ( 4 ) unit multiple dwelling to a ( 9 ) unit multiple dwelling and convert existing ground floor/basement space to (…
Issued Aug 20 · 4 permits
$836K
Install new above ground 2- 20000 gallon doubled walled OP channel fire safe tanks piping islands and dispensers under new canopy. *** Digeplan ***