Issued Jan 23 · 3 permits
$3M
Remove and replace (2) Boilers w/ rework on steam, condensate, water and gas piping. Remove and replace (30) FCU w/ rework of associated Steam and CW piping.
Get ProEvery project in every city · from $33/mo
Get ProMonthly permit report
By declared value.
Issued Jan 23 · 3 permits
$3M
Remove and replace (2) Boilers w/ rework on steam, condensate, water and gas piping. Remove and replace (30) FCU w/ rework of associated Steam and CW piping.
Issued Jan 7 · 4 permits
$2M
To an existing 1 story commercial building tear off roof to deck install new roofing to flat roof. ***Digeplan***
Issued Jan 7 · 4 permits
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
$1.7M
Demolition and replacement of 1-story pre-engineered metal building with new 8270 S.F Addition to existing vehicle motor modification center; Bison Fleet Specialists. Parking…
Issued Jan 13 · 2 permits
$1.2M
Demo existing drywall to install blocking for the installation of a new video wall screen. *** A separate electrical permit is required for any new electrical installation ***
Issued Jan 20 · 3 permits
$948K
To an existing 4 story building interior build out to include 1st floor commercial space and 1 apartment on each floor 2 through 4 *** Digeplan *** *** Negative Asbestos Survey…
Issued Jan 5
$700K
Renovation of 7 existing apartments. First floor retail spaces not included in SOW. *** Digeplan ***
Issued Jan 15 · 2 permits
$519K
Service Mast Replacement - Update Grounding - 200 amp now/staying 200amp
Issued Jan 12 · 3 permits
$425K
2. Form and pour new 44' x 55' x 8" concrete pad for new 9500 gallon AST 3. Install (38) 6" x 7' concrete filled bollards with "maintenance free" covers 4. Install (4) 5' x 5' x…
Issued Jan 5 · 2 permits
$419K
Renovation to existing basement space to expand medical practice " Osteopathic Wellness Medicine of WNY " as per plans submitted. *** Digeplan ***
Issued Jan 28 · 15 permits
$361K
( Phase 1 ) Partial change of use to convert the existing space at the north east corner portion of structure to ( S-2 / B ) occupancy. Interior build-out for commercial kitchen…
Other months: September 2026 · August 2026 · July 2026 · June 2026 · May 2026 · April 2026