Commercial General Building work permitted December 29, 2025, with 3 permits through January 12, 2026, declaring $425,000 of work. Contractor on record: John Bumpus.
2. Form and pour new 44' x 55' x 8" concrete pad for new 9500 gallon AST 3. Install (38) 6" x 7' concrete filled bollards with "maintenance free" covers 4. Install (4) 5' x 5' x 5' footers for new 24' x 36' canopy 5. Install dual hose Gasboy diesel dispenser with above ground containment box, 3/4 hp STP, clock gauge etc. 6. Install spill box and piping for fill ***CANOPY NOT INCLUDED WITH THIS PERMIT*** *** Digeplan ***
Buffalo permit records name John Bumpus and Kelly Davis as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
3 permits issued Dec 29 – Jan 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#TANK25-9664495 |
Commercial and multifamily, biggest first.
TANK · FLAMABLE LIQUIDS INSTALLER
Install new 9500 gallon AST above ground tank. ***Digeplan***
| John Bumpus |
| $125K |
#TANK25-9664496 TANK · FLAMABLE LIQUIDS INSTALLER Removal and disposal of existing 10,000 dbl fiberglass UST tank. ***Digeplan*** | John Bumpus | $125K |
#REP25-9664498 REP-PLANS · LIGHT COMMERCIAL CONTRACTOR 2. Form and pour new 44' x 55' x 8" concrete pad for new 9500 gallon AST 3. Install (38) 6" x 7' concrete filled bollards with "maintenance free" covers 4. Install (4) 5' x 5' x 5' footers for new 24' x 36' canopy 5. Install dual hose Gasboy diesel dispenser with above ground containment box, 3/4… | Kelly Davis | $300K |