Commercial General Building, Electrical, Hvac/Mechanical, Plumbing work permitted November 19, 2024, with 7 permits through May 14, 2026, declaring $18,167,860 of work. Contractor on record: Mark Young.
*** Change Of Use / Use *** Convert the existing building Use from Manufacturing/Distribution Center to ( Dwelling, Multiple Unit ) Use for ( 64 ) apartment units with ( 77 ) bedrooms in the ( N-1S ) zone on existing 0.72 acre parcel. The development includes the new construction of a parking lot for accessory outdoor parking having ( 15 ) parking stalls & the conversion of the first floor of the existing 2-story portion of the building for indoor parking having ( 13 ) parking stalls and the addition of ( 20 ) vehicle parking spaces for parallel parking along the Exchange Street ROW. ***…
Buffalo permit records name Mark Young, Marcello Battisti and Joseph Billone as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
7 permits issued Nov 19 – May 14, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#ELEC26-9687857 ELECTRICAL · MASTER ELECTRICIAN This is a request for inspection of a utility pole mounted power supply for Spectrum Cable. The ESR# is 31304351. Though the address is 619 Exchange St the supply is listed with Nat Grid as 241 Larkin St and that is where the supply is. The POC for this power supply is Joe Cone and I can be… | Marcello Battisti | $2K | |
#PLUM25-9647995 PLUMBING · PLUMBERS MASTER Provide and install new UG sanitary waste, vent, storm piping. Provide and install new Aboveground waste, vent, domestic water hot & cold. Provide and install condensate piping. Provide and install gas piping. Provide and install plumbing fixtures and equipment | Joseph Billone | $980K | |
#GC25-9630133 GC · GENERAL CONTRACTOR *** Change Of Use / Use *** Convert the existing building Use from Manufacturing/Distribution Center to ( Dwelling, Multiple Unit ) Use for ( 64 ) apartment units with ( 77 ) bedrooms in the ( N-1S ) zone on existing 0.72 acre parcel. The development includes the new construction of a parking lot… | Patrick Rogers | $15M | |
#TEAR25-9642473 TEAROUT · GENERAL CONTRACTOR Interior Demolition and abatement of ACM per attached survey and work plan. *** asbestos clean letter required prior to final inspection *** *** repair work to be completed under separate permit *** *** digeplan *** | Mark Young | $535K | |
#ELEC25-9646435 ELECTRICAL · MASTER ELECTRICIAN 64 NEW APARTMENTS 65 METERS = $1.625.00 104,361 SQ FT | Keith A Bader | — | |
#HEAT25-9642278 HEATING · HEATING CONTRACTOR HVAC: JOB#36129 1ST FLOOR:22,000 SQ FT 2ND FLOOR:23,000 SQ FT 3RD FLOOR:23,000 SQ FT 4TH FLOOR: 13,500 SQ FT | Daniel Fetes | $1.6M | |
#REP24-9624129 REPAIR · GENERAL CONTRACTOR Removal of asbestos roofing and installation of temp roof. besides the penthouse which will be removed at a later date *** A CLEAN LETTER MUST BE PROVIDED PRIOR TO FINAL INSPECTION *** *** ANY STREET OR SIDEWALK CLOSURES REQUIRE A SEPARATE D.P.W. PERMIT *** *** FILED THROUGH DIGEPLAN *** | Mark Young | $91K |