Commercial General Building, Demolition, Electrical, Hvac/Mechanical, Plumbing work permitted December 19, 2025, with 6 permits through October 16, 2026.
We propose to perform three (3) soil borings to maximum depths of 60 feet below existing grades or refusal, whichever occurs first. The borings will be advanced using a geotechnical drill rig which utilizes 3.25-inch hollow stem augers. Upon completion, the borings will be backfilled with a bentonite slurry in general accordance with DOEE requirements.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
6 permits issued Dec 19 – Oct 16, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#E2700515 SUPPLEMENTAL · ELECTRICAL |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |
#M2700196 SUPPLEMENTAL · MECHANICAL Status: Permit Issued | Not published | — |
#B2605160 CONSTRUCTION · ADDITION ALTERATION REPAIR The 40,000sf building is located at 711 Edgewood Street NE, Washington DC. It is fit out for school use now, but our scope will be a total gut renovation, plus a small addition, and limited site work. The project will be a level 3 alteration, as we are essentially only salvaging the shell of the… Status: Permit Issued | Not published | — |
#P2700463 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#D2600270 CONSTRUCTION · DEMOLITION THE SCOPE OF WORK APPROVED IN THIS DEMOLITION PERMIT IS LIMITED TO INTERIOR ONLY.? NO EXTERIOR WORK INVOLVING EXTERIOR WALL REMOVAL OR ANY OTHER OUTSIDE WORK THAT WOULD CREATE EARTH DISTURBANCE OR RUNOFF ARE PERMITTED IN THIS DEMOLITION PERMIT.? THIS PERMIT COVERS INTERIOR ONLY DEMOLITION THE… Status: Permit Issued | Not published | — |
#SB2600040 CONSTRUCTION · MISCELLANEOUS - SOIL BORING We propose to perform three (3) soil borings to maximum depths of 60 feet below existing grades or refusal, whichever occurs first. The borings will be advanced using a geotechnical drill rig which utilizes 3.25-inch hollow stem augers. Upon completion, the borings will be backfilled with a… Status: Permit Issued | Not published | — |