Get ProEvery project in every city · from $79/mo
Get Pro46 demolition permits on commercial and multifamily jobs in the last 90 days. See the contractor on every job and get new ones by email each morning.
Newest permit in Washington DC issued October 27, 2026
Updated daily
INTERIOR RENOVATION OF EXISTING TENANT SPACES AT SHOP # 9 AND SHOP #10 TO INCLUDE RENOVATING EXISTING BARS, INTERIOR SEATING AND LIGHTING.
TK Elevator to provide labor and materials to replace existing /worn hoist cables on Car #23 with new like in kind.
| Week of | Permits |
|---|---|
| Jul 27 | 0 |
| Aug 3 | 2 |
| Aug 10 | 9 |
| Aug 17 | 7 |
| Aug 24 | 4 |
| Aug 31 | 5 |
| Sep 7 | 1 |
| Sep 14 | 5 |
| Sep 21 | 6 |
| Sep 28 | 2 |
| Oct 5 | 0 |
| Oct 12 | 1 |
| Oct 19 | 1 |
Washington DC doesn’t publish contractor names.
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
Contractors are named 30 days after the first permit; Pro sees them the day it’s issued.
Installation of a New 8-inch Combined Domestic and Fire Service for a Backflow Prevention Assembly (BPA) to be installed inside the DGS Advanced Technology Center (DC DGS/OSSE),…
Fabrication and Installation of 158.4"x12"x3" deep open faced, fabricated channel letters with white LED faux-neon lighting. Final hook up only to pre-existing circuit
NEW WALL PARTITION TO DEMISE LARGE CONFERENCE ROOM INTO TWO SMALLER ROOMS. CEILING AND LIGHTING MODIFICATIONS NEEDED TO ACCOMMODATE LAYOUT.
Revisison to issued permit #B2500179. Scope of work to include a CRAC unit in lieu of an exhaust fan in the LAN room. Minor electrical changes.
| Issued | Project | Type | Project value | Contractor |
|---|---|---|---|---|
| Oct 27 | INTERIOR RENOVATION OF EXISTING TENANT SPACES AT SHOP # 9 AND SHOP #10 TO INCLUDE RENOVATING EXISTING BARS, INTERIOR SEATING AND LIGHTING. | commercialBuilding, Demolition, Electrical, HVAC / Mechanical, Plumbing | — | Contractor not published |
| Oct 27 | TK Elevator to provide labor and materials to replace existing /worn hoist cables on Car #23 with new like in kind. | commercialBuilding, Demolition, Electrical, Elevator, HVAC / Mechanical, Plumbing | — | Contractor not published |
| Oct 27 |
40 more projects on commercial jobs in the last 90 days
Unlock all 46 projectsEvery project, contractor and phone number · from $79/mo · cancel anytime
Installation of a New 8-inch Combined Domestic and Fire Service for a Backflow Prevention Assembly (BPA) to be installed inside the DGS Advanced Technology Center (DC DGS/OSSE),… |
commercialBuilding, Demolition, Electrical, HVAC / Mechanical, Plumbing |
| — |
Contractor not published |
| Oct 27 | Fabrication and Installation of 158.4"x12"x3" deep open faced, fabricated channel letters with white LED faux-neon lighting. Final hook up only to pre-existing circuit | commercialBuilding, Demolition, Electrical, Plumbing, Signs | — | Contractor not published |
| Oct 27 | NEW WALL PARTITION TO DEMISE LARGE CONFERENCE ROOM INTO TWO SMALLER ROOMS. CEILING AND LIGHTING MODIFICATIONS NEEDED TO ACCOMMODATE LAYOUT. | commercialBuilding, Demolition, Electrical, HVAC / Mechanical, Plumbing | — | Contractor not published |
| Oct 27 | Revisison to issued permit #B2500179. Scope of work to include a CRAC unit in lieu of an exhaust fan in the LAN room. Minor electrical changes. | commercialBuilding, Demolition, Electrical, Plumbing | — | Contractor not published |