Get Promultifamily project · Washington DC, DC
Multifamily General Building, Electrical, Elevator work permitted June 30, 2026, with 3 permits through October 20, 2026.
Provide new infrared electronic door edge protection, controller, terminal stopping devices, car top inspection control station, wiring, pit switch, car door controller, hoistway/car door equipment, hoistway doors, operating devices, signal devices, machine, and governor.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Jun 30 – Oct 20, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#EA2602482 SHOP DRAWING · ELEVATOR - ALTERATION Provide new infrared electronic door edge protection, controller, terminal stopping devices, car top inspection control station, wiring, pit switch, car door controller, hoistway/car door equipment, hoistway doors, operating devices, signal devices, machine, and governor. |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |
#E2610400 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2606681 CONSTRUCTION · ALTERATION AND REPAIR *INTERIOR WORK ONLY***REPAIR & REPLACE THE BELOW ITEMS IN THE E.M.R***Replace the elevator mainline disconnect, Replace the 110v cab light disconnect, Replace lights and GFIs in EMR and Pit, Replace elevator pit access ladder. Status: Permit Issued | Not published | — |