Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DCNew: first permit Oct 15
Multifamily General Building, Electrical, Plumbing work permitted October 15, 2026, with 3 permits through October 19, 2026.
INTERIOR RENOVATION OF THE EXISTING TOILET ROOMS ON THE MAIN FLOOR LEVEL OF EXISTING CHURCH BUILDING. THIS PROJECT IS AN "ALTERATION LEVEL 1" (PER SECTION 503 OF THE IECC). THE PROJECT SCOPE IS LIMITED TO THE REMOVAL AND REPLACEMENT OR THE COVERING OF EXISTING MATERIALS, ELEMENTS, EQUIPMENT, OR FIXTURES USING NEW MATERIALS, EQUIPMENT, OR FIXTURES WHICH DO NOT INVOLVE RECONFIGURATION OF SPACE, OR CHANGE OF USE WITHIN THE BUILDING.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Oct 15 – Oct 19, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#P2700556 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published |
Commercial and multifamily, biggest first.
| — |
#E2700562 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2607620 CONSTRUCTION · ALTERATION AND REPAIR INTERIOR RENOVATION OF THE EXISTING TOILET ROOMS ON THE MAIN FLOOR LEVEL OF EXISTING CHURCH BUILDING. THIS PROJECT IS AN "ALTERATION LEVEL 1" (PER SECTION 503 OF THE IECC). THE PROJECT SCOPE IS LIMITED TO THE REMOVAL AND REPLACEMENT OR THE COVERING OF EXISTING MATERIALS, ELEMENTS, EQUIPMENT, OR… Status: Permit Issued | Not published | — |