Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building, Demolition work permitted March 3, 2026, with 2 permits through August 31, 2026.
Interior Demolition, cut cap and make safe MEP and FA, Abatement.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Mar 3 – Aug 31, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#D2600484 CONSTRUCTION · DEMOLITION Interior Demolition, cut cap and make safe MEP and FA, Abatement. Status: Permit Issued | Not published | — | |
#SB2600083 CONSTRUCTION · MISCELLANEOUS - SOIL BORING |
Commercial and multifamily, biggest first.
Site of Embassy Building No. 10 We propose to perform one (1) soil boring to a maximum depth of 50 feet below existing grades or refusal, whichever occurs first. The borings will be advanced using a geotechnical drill rig which utilizes 3.25-inch hollow stem augers. Upon completion, the borings…
Status: Permit Issued
| Not published |
| — |