Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building, Electrical, Elevator, Hvac/Mechanical, Plumbing work permitted January 8, 2025, with 62 permits through October 27, 2026.
THE PROJECT CONSIST OF INTERIOR RENOVATIONS TO PORTIONS OF THE EXISTING PACU, ANESTHESIA OFFICES, SURGICAL OFFICES, AND STORAGE AREA OF THE MEDSTAR WASHINGTON HOSPITAL CENTER MAIN BUILDING GROUND FLOOR. THE RENOVATION WILL CONVERT EXISTING OFFICE AREAS INTO NEW PACU BAYS. THE EXISTING OFFICE GROUPS WILL BE RELOCATED INTO THE CURRENT STORAGE AREA. THE NEW PACU SUITE WILL CONSIST OF PATIENT PACU BAYS, PATIENT & STAFF TOILETS, EQUIPMENT STORAGE, SOILED HOLDING, CLEAN STORAGE, EVS, AND A NURSE STATION .
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
62 permits issued Jan 8 – Oct 27, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#B2607065 CONSTRUCTION · ALTERATION AND REPAIR THE PROJECT CONSIST OF INTERIOR RENOVATIONS TO PORTIONS OF THE EXISTING PACU, ANESTHESIA OFFICES, SURGICAL OFFICES, AND STORAGE AREA OF THE MEDSTAR WASHINGTON HOSPITAL CENTER MAIN BUILDING GROUND FLOOR. THE RENOVATION WILL CONVERT EXISTING OFFICE AREAS INTO NEW PACU BAYS. THE EXISTING OFFICE… Status: Permit Issued |
| Not published |
| — |
#B2608641 CONSTRUCTION · ALTERATION AND REPAIR MINOR DEMOLITION, TENANT IMPROVEMENT/ALTERATIONS TO INTERIOR BUILD OUT OF NON-LOAD BEARING PARTITIONS AND INSTALLATION OF FURNITURE IN EXISTING OCCUPIED SPACE. NO STRUCTURAL MODIFICATIONS REQUIRED. NO NEW PLUMBING --- FAST TRACK Status: Permit Issued | Not published | — |
#E2612994 SUPPLEMENTAL · ELECTRICAL Electrical Trade Permit Status: Permit Issued | Not published | — |
#E2612993 SUPPLEMENTAL · ELECTRICAL Electrical Trade Permit Status: Permit Issued | Not published | — |
#E2611989 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2610844 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#M2603904 SUPPLEMENTAL · MECHANICAL Status: Permit Issued | Not published | — |
#P2609745 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#P2609429 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#P2609431 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#P2609430 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2610309 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#M2603639 SUPPLEMENTAL · MECHANICAL Status: Permit Issued | Not published | — |
#P2609077 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#B2603555 CONSTRUCTION · ALTERATION AND REPAIR Temporary piping and wiring for temporary rented cooling towers Status: Permit Issued | Not published | — |
#B2603483 CONSTRUCTION · ALTERATION AND REPAIR Alterations and repair for the connections of a temporary boiler to the existing boiler. Status: Permit Issued | Not published | — |
#P2606422 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#B2509973 CONSTRUCTION · ALTERATION AND REPAIR MODIFY AN EXISTING WET SPRINKLER SYTSTEM. TOTAL SPRIKLER HEADS TO BE INSTALLED IS 19 Status: Permit Issued | Not published | — |
#E2606982 SUPPLEMENTAL · ELECTRICAL Electrical Trade Permit Status: Permit Issued | Not published | — |
#B2601620 CONSTRUCTION · ALTERATION AND REPAIR LEVEL 2 ALTERATION OF THE EXISTING SPD (CENTRAL STERILE PROCESSING DEPARTMENT) LOCATED WITHIN BASEMENT OF THE EXISTING MAIN BUILDING OF THE MEDSTAR WASHINGTON HOSPITAL CENTER, INCLUDING REPLACEMENT OF EXISTING PROCESSING SINKS AND ADDING NEW SINKS & SONIC WASHERS. ALTERATIONS WILL INCLUDE UPDATED… Status: Permit Issued | Not published | — |
#M2602131 SUPPLEMENTAL · MECHANICAL Status: Permit Issued | Not published | — |
#P2605510 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2606309 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2606165 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2606166 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2604853 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2605685 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2510165 CONSTRUCTION · ALTERATION AND REPAIR THE PROJECT CONSISTS OF INTERIOR RENOVATIONS (ALTERATIONS LEVEL 2) TO THE G126 SPACE LOCATED AT THE GROUND FLOOR OF MEDSTAR WASHINGTON HOSPITAL CENTER. THIS PROJECT COMPRISES TWO PHASES: PHASE A (CONSTRUCTION): RENOVATION OF TWO HYBRID OPERATING ROOMS AND ANCILLARY SPACES PHASE B (EQUIPMENT… Status: Permit Issued | Not published | — |
#E2605583 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2604538 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#FB2600034 SUPPLEMENTAL · BOILER - FUEL BURNING Status: Permit Issued | Not published | — |
#P2604220 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#P2604204 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2605182 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2601418 CONSTRUCTION · ALTERATION AND REPAIR Interior renovations of the 5th floor will create new offices, exam/consult rooms, and support spaces. The NICU locker room will be relocated to allow for additional exam rooms and EP Storage. The Lactation Suite will move to the 2nd floor. Status: Permit Issued | Not published | — |
#E2604875 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2600523 CONSTRUCTION · ALTERATION AND REPAIR BFPE International has been contracted to provide a new clean agent fire suppression panel for the Washington Hospital Center project located at 110 Irving St NW. The system will protect Room 1B3A. The new panel shall be a one for one replacement of the existing faulty FSCP. Status: Permit Issued | Not published | — |
#M2601401 SUPPLEMENTAL · MECHANICAL Status: Permit Issued | Not published | — |
#P2603949 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2604746 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2603290 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#B2509808 CONSTRUCTION · ALTERATION AND REPAIR THE PROJECT CONSISTS OF INTERIOR RENOVATIONS (ALTERATIONS LEVEL 2) TO EXISTING OPERATING ROOMS LOCATED ON THE GROUND FLOOR OF MEDSTAR WASHINGTON HOSPITAL CENTER. THIS PROJECT COMPRISES TWO CONSTRUCTION PHASES: PHASE A: THREE OPERATING ROOMS PLUS ANCILLARY SPACES PHASES B & C (COMBINED): FIVE… Status: Permit Issued | Not published | — |
#P2602258 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#EA2600255 SHOP DRAWING · ELEVATOR - ALTERATION TKE to modernize 2 traction elevators. Scope: New controller, new machine, new governor, new car, new hoistway wiring and ducts (as needed), new counterwights in pit (as needed), new cab, new door equipment, new car fixtures, and new hall fixtures. Status: Permit Issued | Not published | — |
#E2602550 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2600673 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#P2511189 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2513032 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2506593 CONSTRUCTION · ALTERATION AND REPAIR Removal of 1 wall, 2 doors and millwork with sinks. Installation of new door, new millwork with sink and new finishes. Mechanical, electrical and plumbing related to new room layout Status: Permit Issued | Not published | — |
#B2508122 CONSTRUCTION · ALTERATION AND REPAIR DIGITAL WALKTHROUGH - ***Interior Work Only*** Repair and replace the following items in the elevator machine room only. Replacement of existing mainline and cab light disconnect. Replacement of existing machine room lights & outlets. Replacement of existing HVAC unit. Replacement of existing… Status: Permit Issued | Not published | — |
#B2504411 CONSTRUCTION · ALTERATION AND REPAIR Interior alterations and repair to modify the boiler flues for Boiler 5 & 6, install new ID fans on roof, and run new flue piping from each boiler to new fan in the Boiler Plant. Status: Permit Issued | Not published | — |
#E2511747 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2504809 CONSTRUCTION · ALTERATION AND REPAIR MECHANICAL, ELECTRICAL, PLUMBING, AND ARCHITECTURAL ENABLING WORK REQUIRED FOR THE INSTALLATION OF THREE NEW AUTOMATED "CAROUSELS" (PHARMACEUTICAL STORAGE AND AUTOMATED DELIVERY EQUIPMENT) WITHIN THE EXISTING MAIN PHARMACY AT WASHINGTON HOSPITAL CENTER, BASEMENT LEVEL. Status: Permit Issued | Not published | — |
#UT2500047 CONSTRUCTION · MISCELLANEOUS - UNDERGROUND STORAGE TANK Installation of one (1) 10,000-gallon aboveground storage tank (AST) Status: Permit Issued | Not published | — |
#E2510218 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2505091 CONSTRUCTION · ALTERATION AND REPAIR New doors, ceiling tiles, bulkhead, lights, diffuser, and ductwork; relocation of medical gas outlets; new corian countertop and sink; new custom millwork; new sheet vinyl flooring. Area affected 279 SF Status: Permit Issued | Not published | — |
#SB2500130 CONSTRUCTION · MISCELLANEOUS - SOIL BORING ECS proposes using a track-mounted Geoprobe to advance up to three (3) borings on the site to a depth of 15 feet below ground surface. No permanent wells will be installed. Status: Permit Issued | Not published | — |
#SB2500137 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Geotechnical exploration for new building Status: Permit Issued | Not published | — |
#E2506284 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#M2502040 SUPPLEMENTAL · MECHANICAL Status: Permit Issued | Not published | — |
#P2502816 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2503832 SUPPLEMENTAL · ELECTRICAL Electrical Trade Permit Status: Permit Issued | Not published | — |