Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building, Electrical, Hvac/Mechanical, Plumbing work permitted March 31, 2025, with 21 permits through October 27, 2026.
REVISION OF B2501033, THE SCOPE OF WORK HAS BEEN UPDATED TO INCLUDE AN PARTIAL RENOVATION TO THE EXISTING BREAK ROOM IN THE CENTER TO BE CONVERT IT TO A SOILED HOLDING ROOM.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
21 permits issued Mar 31 – Oct 27, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2607034 CONSTRUCTION · ALTERATION AND REPAIR REVISION OF B2501033, THE SCOPE OF WORK HAS BEEN UPDATED TO INCLUDE AN PARTIAL RENOVATION TO THE EXISTING BREAK ROOM IN THE CENTER TO BE CONVERT IT TO A SOILED HOLDING ROOM. Status: Permit Issued |
Commercial and multifamily, biggest first.
| Not published |
| — |
#E2610209 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2607855 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2606661 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#P2606483 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#B2603284 CONSTRUCTION · ALTERATION AND REPAIR Suite 321. Alteration of existing demised space for tenant fit-out of doctor's office for The Neurology Center Status: Permit Issued | Not published | — |
#FB2600033 SUPPLEMENTAL · BOILER - FUEL BURNING Status: Permit Issued | Not published | — |
#P2604531 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#P2604335 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2605249 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2604089 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#P2604098 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#B2601604 CONSTRUCTION · ALTERATION AND REPAIR SUITE 4800 -- MINOR DEMOLITION, TENANT IMPROVEMENT/ALTERATIONS TO INTERIOR BUILD OUT OF NON-LOAD BEARING PARTITIONS AND INSTALLATION OF FURNITURE IN EXISTING OCCUPIED SPACE. NO STRUCTURAL MODIFICATIONS REQUIRED. AREA AFFECTED 1281 SF Status: Permit Issued | Not published | — |
#P2602192 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#P2510798 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2511784 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2511555 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2508746 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#B2505277 CONSTRUCTION · ALTERATION AND REPAIR REPLACEMENT IN-KIND OF ENTRY DOOR NEW ATC CEILING TILES, LIGHTS, SUPPLY UNIT, DUCTWORK, AND DIFFUSERS NEW BASE AND WALL CABINETS AROUND CORIAN COUNTERTOP WITH INTEGRAL SINK NEW CORIAN MILLWORK COUNTERTOP IN CONTROL AREA. AREA AFFECTED 260 SF Status: Permit Issued | Not published | — |
#E2508773 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2501033 CONSTRUCTION · ALTERATION AND REPAIR THIS PROJECT CONSIST OF INTERIOR ALTERATION OF THE BREAST IMAGING CENTER AT THE MEDSTAR WASHINGTON HOSPITAL CENTER TO EXPAND THE FACILITIES. THE WORK HERE-IN CONSISTS OF NEW CONSTRUCTION FIT-OUT TO THE HOSPITAL STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING WORK HAS BEEN INCORPORATED TO SUPPORT… Status: Permit Issued | Not published | — |