Get Procommercial project · Tacoma, WA
Commercial General Building, Fire Protection, Hvac/Mechanical work permitted August 4, 2026, with 3 permits through October 7, 2026, declaring $7,947,946 of work.
Replacement of end-of-life HVAC units, reconfiguring of ductwork to support new equipment, door replacements, replace/supplement exterior LED lighting, interior lighting mods, replace fuel monitoring system, add canopy over exterior fuel tank, electrical upgrades to replace manual transfer switch (MTS) with new automatic transfer switch (ATS) for transfer between permanent generator and tap box, new panelboards for DC and HVAC equipment, new 800A AC distribution board, and security system upgrades/modifications at Verizon Wireless. **IF PLUMBING & MECHANICAL PLANS WERE SUBMITTED, THE…
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Aug 4 – Oct 7, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 17 | #FIREC26-0172 Building · Fire Protection |
Commercial and multifamily, biggest first.
INSTALL VESDA DETECTION SYSTEM AT VERIZON TACOMA
Status: Permit Issued
| Not published |
| $53.7K |
| applied Aug 4 | #MECHC26-0164 Building · Mechanical Install of New CRAC units and outdoor condensing units, associated ductwork, piping, & controls. Building Permit Number: BLDCA25-0187 Status: Permit Issued | Not published | $1.1M |
| applied Jun 17 | #BLDCA25-0187 Building · Alteration Replacement of end-of-life HVAC units, reconfiguring of ductwork to support new equipment, door replacements, replace/supplement exterior LED lighting, interior lighting mods, replace fuel monitoring system, add canopy over exterior fuel tank, electrical upgrades to replace manual transfer switch… Status: Permit Issued | Not published | $6.8M |