Commercial General Building, Fire Protection, Hvac/Mechanical, Plumbing, Sign work permitted November 8, 2024, with 13 permits through July 23, 2026, declaring $13,205,218 of work.
The mechanical system will be independent and include: VRF system consisting of (12) branch selectors, (11) condensing (outdoor) units, and (90) fan coil (indoor) units. (5) Electric unit heaters, (1) fan (0.5 HP), and (2) DOAS units (13 ton cooling coil, 6 ton heating coil & heat recovery).
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
13 permits issued Nov 8 – Jul 23, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Dec 9 | #SIGN25-0136 |
Commercial and multifamily, biggest first.
Sign
(4) SF Illuminated Fascia Signs and (2) SF Non Illuminated Fascia Signs.
Status: Permit Issued
| Not published |
| $45.7K |
| applied May 28 | #FIREC25-0119 Building · Fire Protection Modify existing fire alarm system for tenant improvements. Mary Bridge Children's Hospital. CHC West Medical Office Building. Level 01, 02, and 03. 311 South L Street Tacoma WA 98405. Install (282) new devices and (9) relocated devices. This is a joint venture between Johnson Controls Fire… Status: Finaled | Not published | $297K |
| applied Aug 6 | #MECHC25-0203 Building · Mechanical VRF system consisting of 90 fan coil (indoor) units and 5 electric unit heaters in MOB Status: Finaled | Not published | $1.5M |
| applied Jun 23 | #STORM25-0028 Utility Connection 3 of 3 offsite connection for storm on the Mary Bridge MOB Status: Permit Issued | Not published | $7.5K |
| applied Jun 23 | #STORM25-0026 Utility Connection (3) Storm Connections for the Mary Bridge Medical Office Building Offsite work on Division. Status: Permit Issued | Not published | $7.5K |
| applied Jun 6 | #FIREC25-0123 Building · Fire Protection Install a new automatic fire sprinkler system Status: Finaled | Not published | $460K |
| applied Jun 20 | #PLMBC25-0169 Building · Plumbing Provide Plumbing Services for the Level 2 Tenant Improvement Buildout. Status: Approved | Not published | $612K |
| applied Jun 23 | #STORM25-0027 Utility Connection 2 of 3 storm connections for the offsite work on Division at Commercial Status: Permit Issued | Not published | $7.5K |
| applied May 30 | #MECHC25-0144 Building · Mechanical The mechanical system will be independent and include: VRF system consisting of (12) branch selectors, (11) condensing (outdoor) units, and (90) fan coil (indoor) units. (5) Electric unit heaters, (1) fan (0.5 HP), and (2) DOAS units (13 ton cooling coil, 6 ton heating coil & heat recovery). Status: Finaled | Not published | $6.5M |
| applied Apr 7 | #PLMBC25-0100 Building · Plumbing Provide Plumbing and Medical Gas Services for the Level 1 Tenant Improvement buildout. **06/26/25: Level 3 Tenant Improvement plumbing fixtures and plans added to scope** **07/01/25: Level 2 Tenant Improvement plumbing fixtures added to scope** Status: Finaled | Not published | $2.3M |
| applied Dec 16 | #FIREC24-0296 Building · Fire Protection Modify existing fire alarm system . Upgrade existing 4100U Fire Alarm Control Panel to 4100ES. Install (1) new Transponder Panel and (79) new devices. at COMMERCIAL MARY BRIDGE CHILDRENS HOSPITAL & MULTICARE HEALTH SYSTEM & TACOMA GENERAL HOSPITAL ET AL Status: Finaled | Not published | $96.4K |
| applied Oct 7 | #MECHC24-0259 Building · Mechanical REMOVE AND REPLACE GAS FIRED BOILERS AT MARY BRIDGE CHILDREN'S HEALTH CENTER. Status: Finaled | Not published | $180K |
| applied Nov 6 | #PLMBC24-0232 Building · Plumbing Shell and Core plumbing for new MOB Status: Finaled | Not published | $1.3M |