Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing, Roofing work permitted November 13, 2024, with 17 permits through October 5, 2026, declaring $13,936,938 of work.
Get new commercial permits near 98405 or Tacoma, free weekly email
Addition of new Chillers, replacement of Air Handler Unit, addition of humidification and humidity controls to serve the operating rooms at Allenmore Hospital. ***Field Revision 1: FRC26-0004 Approved 2.6.2026 Installation of ATS panel on concrete pad outside the building footprint with some modification of sidewalk and landscaping : SWITCHGEAR & ATS REPLACEMENT
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
17 permits issued Nov 13 – Oct 5, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 29 |
Commercial and multifamily, biggest first.
#PLMBC26-0159
Building · Plumbing
Expanding the medical gas system of the double occupancy rooms at MHS- ALLENMORE.***REFERENCE BUILDING PERMIT# BLDCA26-0200***
Status: Permit Issued
| Not published |
| $50K |
| applied Jul 10 | #BLDCA26-0200 Building · Alteration Expanding the med gas system and interior refresh of the double occupancy rooms at Allenmore Hospital. **RELATED TO VOIDED PERMIT BLDCA25-0058** Status: Permit Issued | Not published | $700K |
| applied Jan 7 | #BLDCA26-0006 Building · Alteration Replacement of electrical generator and construction of generator pad and fencing in parking lot area of Allenore Hospital. Conduits will run across the drive aisle on a trestle and connect with the building switchgear. Status: Permit Issued | Not published | $3.3M |
| applied Sep 17 | #SDEV25-0302 Site Installation of New Above Ground Generator and Double Walled Fuel Tank. Installation of Overhead Gantry System to connect new generator to electrical rooms on South face of Allenmore Hospital. Status: Permit Issued | Not published | $2.5M |
| applied May 29 | #PLMBC26-0123 Building · Plumbing • Provide and install AirStar 30 oilless compressor with sound cover • Provide and install 4 HP Hydromister vacuum system • Tie into existing vac and air systems • Rework piping as needed • Cap existing system • Run electrical to new compressor and vacuum system • Provide and install regulator for… Status: Finaled | Not published | $43K |
| applied Jul 9 | #EFIREA26-0025 ePermit · Alarm Modification to existing fire alarm system for tenant improvements. Installation of (2) new devices. Status: Finaled | Not published | $12.8K |
| applied May 27 | #ESTRIP26-0013 ePermit · Strip Re-Roof 6 distinct areas at Allenmore Hospital. Removing existing rock ballast and EPDM membrane. Leaving lightweight insulation concrete in place. Installing new fully adhered coverboard and 60 mil EPDM roof system with new sheet metal flashings and coping. At boiler roof only, tear off down to… Status: Permit Issued | Not published | $514K |
| applied Nov 25 | #MECHC25-0301 Building · Mechanical Provide and install Exhaust fans, GRD's, required ductwork, and test provided equipment. Status: Finaled | Not published | $21K |
| applied Nov 5 | #EFIREA25-0019 ePermit · Alarm Modify existing fire alarm system for tenant improvements. Humidity Control Mechanical Room, Level 1 Center South. Install (1) smoke device, (1) pull station, (1) speaker/strobe. This is a joint venture between Johnson Controls Fire Protection and KBE Electric Company. Status: Permit Issued | Not published | $10K |
| applied Mar 31 | #MECHC25-0095 Building · Mechanical Provide and install replacement (2) 80-ton and (1) 100-ton RTU's and remove existing fan and replace with fan wall.at MEDICAL OFFICES SERVICES Status: Finaled | Not published | $600K |
| applied Apr 9 | #PLMBC25-0101 Building · Plumbing Plumb 1 toilet, and 2 lavs Status: Permit Issued | Not published | $17.5K |
| applied Apr 7 | #EFIRES25-0003 ePermit · Sprinkler MODIFY THE EXISTING SPRNKLER SYSTEM TO ACCOMMODATE THE NEW BUILDING ADDITION. Status: Finaled | Not published | $5.3K |
| applied Jan 24 | #MECHC25-0032 Building · Mechanical Addition of new chillers, replacement of air handler unit, addition of humidification and humidity controls to serve the operating rooms at Allenmore Hospital. Status: Finaled | Not published | $2.6M |
| applied Jan 24 | #PLMBC25-0031 Building · Plumbing Addition of new chillers, replacement of air handler unit, addition of humidification and humidity controls to serve the operating rooms at Allenmore Hospital. Approved under BLDCA24-0407 Status: Finaled | Not published | $5K |
| applied Oct 9 | #BLDCA24-0407 Building · Alteration Addition of new Chillers, replacement of Air Handler Unit, addition of humidification and humidity controls to serve the operating rooms at Allenmore Hospital. ***Field Revision 1: FRC26-0004 Approved 2.6.2026 Installation of ATS panel on concrete pad outside the building footprint with some… Status: Finaled | Not published | $3.6M |
| applied Jan 8 | #EFIREA25-0001 ePermit · Alarm Modify existing fire alarm system for tenant improvement of switchgear and ATS replacement in basement, new electrical and mechanical rooms. Install (2) new speaker/strobes, (2) new pull stations and (2) new smoke detectors. Multicare Allenmore Hospital 1901 S Union Ave Tacoma WA 98405. This is a… Status: Permit Issued | Not published | $12.6K |
| applied Nov 13 | #EFIREA24-0022 ePermit · Alarm Modify existing fire alarm system for tenant improvements. Humidity Control Mechanical Room, Level 1 Center South. Install (1) smoke device, (1) pull station, (1) speaker/strobe. This is a joint venture between Johnson Controls Fire Protection and KBE Electric Company. Status: Finaled | Not published | $10K |