Commercial General Building, Fire Protection, Hvac/Mechanical, Plumbing, Sign work permitted June 26, 2025, with 19 permits through May 5, 2026, declaring $8,686,414 of work.
Onsite and Offisite improvements associated with the construction of a new medical office building along with the associated parking lot, stormwater facilities, right-of-way improvements, etc. ***FRC25-0181 APPROVED 9/3/25: Revise Alignment of sidewalk, street light conduit, and landscaping on S. Lawrence*** ***FRC26-0250 APPROVED 09/24/26 AS BUILTS***
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
19 permits issued Jun 26 – May 5, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Apr 29 |
Commercial and multifamily, biggest first.
#STORM26-0020
Utility Connection
Stormtech MC-4500 Chamber detention facility per SDEV24-0423. Connection covered under STORM25-0036.
Status: Permit Issued
| Not published |
| $10K |
| applied Dec 10 | #SIGN25-0138 Sign Installation of Illuminated Individual Letters Status: Finaled | Not published | $15K |
| applied Nov 11 | #FIREC25-0276 Building · Fire Protection TENANT IMPROVMENT FIRE ALARM INSTALATION Status: Finaled | Not published | $12K |
| applied Oct 29 | #FIREC25-0267 Building · Fire Protection Install REvisions of Fire S prinkler NFPA13 WET system (144qty) (1) RISER MEDICAL OFFICES SERVICES Status: Finaled | Not published | $37.6K |
| applied Oct 28 | #MECHC25-0288 Building · Mechanical Provide & install new heat recovery VRF HVAC system, energy recovery ventilators (ERV), associated air distribution, & HVAC controls for a new 2-story medical office building. Status: Finaled | Not published | $275K |
| applied Oct 13 | #FIREC25-0252 Building · Fire Protection SHELL AND CORE FIRE ALARM INSTALLATION AT ALLENMORE Status: Finaled | Not published | $20K |
| applied Oct 17 | #PLMBC25-0266 Building · Plumbing Plumbing systems for a 2-story medical office building tenant improvement with-in a new shell & core building under separate permit. Reference tenant improvement approved drawings under Building Permit #BLDC25-0218. Status: Finaled | Not published | $206K |
| applied Jul 31 | #FIREC25-0173 Building · Fire Protection NFPA-13 Fire Sprinkler System at Allenmore Status: Finaled | Not published | $87.8K |
| applied Jul 15 | #BLDCA25-0218 Building · Alteration Alteration of an existing, currently unoccupied shell space for Mary Bridge therapies clinic space. All spaces are all Type B occupancy, medical office building and are DOH CRS reviewable. **IF PLUMBING & MECHANICAL PLANS WERE SUBMITTED, THE BUILDING PERMIT ONLY COVERS PLAN REVIEW. SEPARATE… Status: Finaled | Not published | $1.7M |
| applied Aug 5 | #WATER25-0152 Utility Connection New water line connection at commercial building. No ROW. Status: Finaled | Not published | $7.5K |
| applied Aug 5 | #SEWER25-0558 Utility Connection New sanitary sewer line connection at commercial building. Open trench method. No ROW. Status: Finaled | Not published | $5K |
| applied Aug 5 | #SEWER25-0557 Utility Connection New sanitary sewer line connection at commercial building. Open trench method. No ROW. Status: Finaled | Not published | $5K |
| applied Aug 6 | #STORM25-0036 Utility Connection New stormwater connection for commercial building. Includes seven days of barricade and ROW patch. Status: Finaled | Not published | $5K |
| applied Jul 16 | #FIREC25-0158 Building · Fire Protection Level U, fire service line install Status: Finaled | Not published | $12K |
| applied Jul 30 | #WATER25-0151 Utility Connection Install new water line in commercial building Status: Finaled | Not published | $7.5K |
| applied May 7 | #PLMBC25-0132 Building · Plumbing Install (9) Plumbing & storm drainage systems at COMM VAC LAND- MULTICARE Status: Finaled | Not published | $12.6K |
| applied Nov 22 | #BLDCN24-0083 Building · New Building CONSTRUCTION OF NEW TWO-STORY, 16112 SF OFFICE BUILDING - CORE AND SHELL ONLY ***FRC25-0183 APPROVED 07-30-25 Field Revision to capture coordination items with approved SDEV and WO permits.*** Status: Final Inspection | Not published | $2.6M |
| applied Nov 27 | #SDEV24-0423 Site Onsite and Offisite improvements associated with the construction of a new medical office building along with the associated parking lot, stormwater facilities, right-of-way improvements, etc. ***FRC25-0181 APPROVED 9/3/25: Revise Alignment of sidewalk, street light conduit, and landscaping on S.… Status: Finaled | Not published | $3.7M |
| applied Nov 27 | #WO24-0134 Site Onsite and Offisite improvements associated with the construction of new medical office building along with the associated parking lot, stormwater facilities, right-of-way improvements, etc. COMBO review with SDEV24-0423 Status: Permit Issued | Not published | $3.7M |