Get ProEvery project in every city · from $79/mo
Get Procommercial project · Tacoma, WA
Commercial General Building, Fire Protection, Hvac/Mechanical, Plumbing, Sign work permitted November 8, 2024, with 8 permits through March 26, 2026, declaring $909,920 of work.
Erect 2 Single faced illuminated Pole sign for (CHENEY STADIUM)”
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
8 permits issued Nov 8 – Mar 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 10 | #PLMBC26-0051 Building · Plumbing Provide labor & materials to replace handwash sinks on 1st & 2nd level on existing rough-in, and a new sink at the 3rd level with new rough-in, and point-of-use water heaters at each sink. |
Commercial and multifamily, biggest first.
Status: Finaled
| Not published |
| $14.4K |
| applied Dec 12 | #BLDCA25-0380 Building · Alteration Construction of new wood decks on existing concrete patio areas and new, fixed roof shelters for existing catering areas at Tacoma Raniers Field. Status: Finaled | Not published | $375K |
| applied Jan 23 | #SIGN25-0011 Sign display reface and cladding replacement Status: Permit Issued | Not published | $34K |
| applied Jan 14 | #MECHC25-0015 Building · Mechanical Add 9k BTU Mini Split Unit to shed. Status: Finaled | Not published | $4K |
| applied Jan 23 | #SIGN25-0010 Sign Erect 2 Single faced illuminated Pole sign for (CHENEY STADIUM)” Status: Permit Issued | Not published | $416K |
| applied Nov 27 | #FIREC24-0280 Building · Fire Protection Additional fire alarm notification device for team store addition. No new detection or control devices will be used for this TI. Status: Finaled | Not published | $9.3K |
| applied Nov 13 | #MECHC24-0289 Building · Mechanical Installation of one (1) rooftop packaged heat pump unit, one (1) energy recovery ventilator, one (1) destratification fan, two (2) louvers, ductwork, and grilles/diffusers at Tacoma Raniers Store. Related to BLDCA24-0110 Status: Finaled | Not published | $50.8K |
| applied Oct 31 | #FIREC24-0250 Building · Fire Protection Extend existing dry system into new addition. Add new sprinkler coverage for new wall in restroom. At Commercial Building -REC ACTIVITIES Status: Finaled | Not published | $6.5K |