Commercial General Building, Fire Protection, Hvac/Mechanical, Plumbing work permitted April 2, 2025, with 13 permits through August 25, 2026, declaring $5,165,657 of work.
Interior improvements including boiler replacement, lighting upgrades, remodeled toilet rooms and new hallway construction at Foss High School.
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
13 permits issued Apr 2 – Aug 25, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 6 | #STORM26-0031 Utility Connection Replace existing catch basins and connect to existing storm drain at Foss High School Courtyard Status: Finaled |
Commercial and multifamily, biggest first.
| Not published |
| — |
| applied Jul 31 | #FIREC26-0154 Building · Fire Protection Fire Alarm work to support new corridor installation at Foss High School Status: Finaled | Not published | $4K |
| applied May 28 | #FIREC26-0098 Building · Fire Protection Fire Sprinkler TI to accommodate changes and add coverage in renovated classroom area per NFPA 13 and City of Tacoma Standards. Status: Finaled | Not published | $5K |
| applied May 8 | #PLMBC26-0103 Building · Plumbing Replace/Modify existing fixtures in 4 main bathrooms, replace fixtures in Economics Kitchen, add 2 floor drains in boiler room, & Replace Misc Drinking Fountains. TACOMA SCHOOL DISTRICT- FOSS HS Status: Finaled | Not published | $225K |
| applied Apr 7 | #BLDCA26-0103 Building · Alteration Interior improvements including boiler replacement, lighting upgrades, remodeled toilet rooms and new hallway construction at Foss High School. Status: Finaled | Not published | $2.4M |
| applied Apr 7 | #MECHC26-0067 Building · Mechanical Upgrading boilers to high efficiency including boiler pumps and mechanical room equipment, upgrading boiler controls, ductwork rearrangement to meet new wall layout, and adding a ductless split to a resource room. Status: Finaled | Not published | $2M |
| applied Dec 9 | #SDEV25-0387 Site Replacement of existing concrete with new paving and replacement of wood bench tops with concrete and steel at Foss High School Courtyard. Status: Finaled | Not published | $100K |
| applied Sep 3 | #PLMBC25-0233 Building · Plumbing Description of Work - Cap 2 sinks for Puget Sound Construction. Related to BLDCA25-0069 Plumbing Contractors License Number – BRIXPPL791N4 Status: Finaled | Not published | $1K |
| applied Sep 16 | #MECHC25-0242 Building · Mechanical 3 ton wall mount mini split in class room 328 at Foss High School Status: Finaled | Not published | $10K |
| applied Sep 11 | #MECHC25-0235 Building · Mechanical Install Transfer air duct and two diffusers at Foss High School Status: Finaled | Not published | $2K |
| applied Jun 25 | #BLDCA25-0204 Building · Alteration New storefront stair enclosure for existing stair. **FRC25-0277 (10.29.25): Construction of new vestibule and railing amendments to one staircase on campus.** Status: Finaled | Not published | $75K |
| applied Jul 22 | #EFIRES25-0011 ePermit · Sprinkler Modify the existing fire sprinkler system to accommodate the new walls. Status: Finaled | Not published | $3.7K |
| applied Mar 10 | #BLDCA25-0069 Building · Alteration Interior alterations in existing school to create office space. **Mechanical and Electrical scopes require separate permits** ***FRC25-0166 APPROVED 08/12/25 Removal of existing operable wall and replacement with new wall and door. Occupancy type not changing*** Status: Finaled | Not published | $340K |