Commercial General Building, Electrical work permitted March 27, 2026, with 3 permits through March 27, 2026, declaring $375,000 of work.
*COMBINED REVIEW* - Installation of a permanent electrical switchgear for the University of Washington Tacoma campus. Project includes the excavation to allow for the installation of a concrete pad and a traffic barrier retaining wall for the electrical pad that houses the switchgear and associated electrical infrastructure. The proposed switchgear will be placed in line with the existing capacitor bank. Underground power lines will require the removal and replacement of cement concrete sidewalk within the South 21st Street right-of-way. Additionally, a portion of the parking lot will be…
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Mar 27 – Mar 27, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jan 9 | #WO26-0002 Site *COMBINED REVIEW (w/ SDEV26-0007)* - Installation of a permanent electrical switchgear for the University of Washington Tacoma campus. Project includes the excavation to allow for the installation of a concrete pad and a traffic barrier retaining wall for the electrical pad that houses the… |
Commercial and multifamily, biggest first.
Status: Final Inspection
| Not published |
| — |
| applied Jan 9 | #SDEV26-0007 Site *COMBINED REVIEW* - Installation of a permanent electrical switchgear for the University of Washington Tacoma campus. Project includes the excavation to allow for the installation of a concrete pad and a traffic barrier retaining wall for the electrical pad that houses the switchgear and… Status: Finaled | Not published | $300K |
| applied Jan 15 | #BLDCA26-0012 Building · Alteration The project consists of the design of a mechanical equipment yard at the University of Washington – Tacoma campus. The structural components of the mechanical yard consist of cast-in-place concrete vehicle barrier walls along the road facing perimeter, retaining walls with chain link mounted… Status: Final Inspection | Not published | $75K |