Commercial General Building, Fire Protection, Hvac/Mechanical, Plumbing work permitted November 27, 2024, with 15 permits through May 12, 2026, declaring $9,907,203 of work.
Get new commercial permits near 98402 or Tacoma, free weekly email
Constructing and removing walls and partitions to create offices and courtrooms. Associated mechanical, plumbing and electrical work, as well as the refinishing of existing walls, ceiling, and floors, and replacement of courtroom doors with updated security & locks. Partial occupancy change on Floor L7B from B occupancy to A3 occupancy at Pierce County Justice Center. ** FRC26-0091- APPROVED 04.14.26- County-City Building - Multiple Floor Tenant Improvement The field revision incorporates coordinated life-safety–driven updates across mechanical, electrical, and architectural disciplines,…
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
15 permits issued Nov 27 – May 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 18 |
Commercial and multifamily, biggest first.
#BLDCA26-0076
Building · Alteration
Alteration to third floor of the C-Wing at the main jail reception area. Limited to replacing approximately 700sf of failed and falling 1 hour rated shaft wall ceiling system. **Fire, Mechanical, and Electrical scopes require separate permits**
Status: Permit Issued
| Not published |
| $190K |
| applied Feb 19 | #FIREC26-0030 Building · Fire Protection Install (3) new addressable smoke detectors for prison inmate elevator 8 lobbies, smoke detector within elevator lobby and machine room will be the only recall for this elevator. Three new addressable relays for primary, alternate and fire hat is added to the design, as none exist. There is no… Status: Permit Issued | Not published | $8.5K |
| applied Sep 16 | #PLMBC25-0250 Building · Plumbing • Demo and temporarily or permanently cap the existing plumbing as shown in the provided drawings. • Modify the existing rough plumbing for the new plumbing fixtures shown in the drawings. Extend the waste and cold-water piping as required. • Furnish and install 1 new specified P-8B bottle filler… Status: Finaled | Not published | $39.2K |
| applied May 6 | #FIREC25-0098 Building · Fire Protection Tenant improvement on 1st floor , 7th floor and 9th floor. Install 3 new power supplies 64 ceiling mount speaker strobes , 7 ceiling mount strobes and 18 wall mount strobes. Status: Finaled | Not published | $22.1K |
| applied May 14 | #FIREC25-0107 Building · Fire Protection KNIGHT FIRE PROTECTION WILL ADD/RELOCATE SPRINKLERS AND REPLACE / RELOCATE BRANCHLINES AS REQUIRED FOR NEW WALLS AND CEILINGS. NEW WET SYSTEM MAINS AND BRANCHLINES ARE TO BE ADDED AT LEVEL 7 WHERE THE EXISTING PREACTION SYSTEM HAS BEEN REMOVED. ***FIELD REVISION: Approved 8/29/25: "… Status: Finaled | Not published | $73.6K |
| applied Apr 18 | #PLMBC25-0115 Building · Plumbing Plumbing work as part of approved permit BLDCA24-0439. *** Field Revision 06-13-2025- Revise plumbing sheet M112 per RFI 167:Remove connections to existing CW supply risers. Route new 7th FLR CCB plumbing fixtures to the main CW riser in the primary plumbing chase. Fixture count remains unchanged. Status: Finaled | Not published | $276K |
| applied May 7 | #FIREC25-0101 Building · Fire Protection ***Reconnect FIRE SPRINKLER NFPA 13 Dry System*** GOVERNMENTAL SERVICES Status: Finaled | Not published | $40K |
| applied Apr 15 | #MECHC25-0107 Building · Mechanical CCB - Multiple Floor Tenant Improvement - Associated with approved permit BLDCA24-0439 Constructing and removing walls and partitions to create offices and courtrooms. Associated mechanical, plumbing and electrical work, as well as the refinishing of existing walls, ceiling, and floors, and… Status: Finaled | Not published | $1M |
| applied Apr 3 | #PLMBC25-0097 Building · Plumbing Alteration of plumbing system to include new piping and fixtures for new and relocated offices and restrooms. **Related to BLDCA24-0439** Status: Permit Issued | Not published | $250K |
| applied Feb 3 | #FIREC25-0025 Building · Fire Protection THIS NETWORK PANEL MIGRATION IS TO UPGRADE THE EXISTING SIEMENS PLATFORM FROM MXL TO THE NEWEST VERSION SIEMENS C-MOD, AND GIVE THE CUSTOMER/BUILDING THE FUTURE ABILITY TO START UPGRADING OUTDATED FIELD DEVICES Status: Finaled | Not published | $19K |
| applied Jan 14 | #FIREC25-0010 Building · Fire Protection THIS NETWORK PANEL MIGRATION IS TO UPGRADE THE EXISTING SIEMENS PLATFORM FROM MXL TO THE NEWEST VERSION SIEMENS C-MOD, AND GIVE THE CUSTOMER/BUILDING THE FUTURE ABILITY TO START UPGRADING OUTDATED FIELD DEVICES Status: Finaled | Not published | $1M |
| applied Nov 8 | #BLDCA24-0439 Building · Alteration Constructing and removing walls and partitions to create offices and courtrooms. Associated mechanical, plumbing and electrical work, as well as the refinishing of existing walls, ceiling, and floors, and replacement of courtroom doors with updated security & locks. Partial occupancy change on… Status: Final Inspection | Not published | $7.9M |
| applied Feb 23 | #PLMBC25-0060 Building · Plumbing Selective demo of 7th floor CCB. Removal of some existing piping and capping off in preparation for existing for future construction. Status: Finaled | Not published | $20K |
| applied Feb 23 | #MECHC25-0060 Building · Mechanical Selective demo of 7th floor CCB. Mechanical scope contained removal of some existing equipment and ducting in preparation for existing for future construction part of permit BLDCA24-0439. Status: Finaled | Not published | $22.7K |
| applied Sep 10 | #PLMBC24-0186 Building · Plumbing Replacing the existing toilets and urinal with new ones. Status: Permit Issued | Not published | $5K |