Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted March 5, 2025, with 28 permits through October 27, 2026, declaring $8,483,682 of work.
Get new commercial permits near 98402 or Tacoma, free weekly email
Three story building addition of approximately 24,227 SF to be used as Residential Dormitory at Tacoma Rescue Mission. **IF PLUMBING & MECHANICAL PLANS WERE SUBMITTED, THE BUILDING PERMIT ONLY COVERS PLAN REVIEW. SEPARATE PERMITS WILL BE REQUIRED FOR FEES & INSPECTION.** **Field Revision #1: FRC26-0135 APPROVED 5.21.26 Request the Fire Sprinkler System to be changed from NFPA 13 to NFPA 13R.
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
28 permits issued Mar 5 – Oct 27, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 27 |
Commercial and multifamily, biggest first.
#EFIREA26-0036
ePermit · Alarm
Add notification devices to remodel areas.
Status: Permit Issued
| Not published |
| $3K |
| applied Oct 2 | #PLMBC26-0204 Building · Plumbing Add break room sink at Tacoma Rescue Mission. Status: Permit Issued | Not published | $4K |
| applied Oct 23 | #EFIRES26-0017 ePermit · Sprinkler Add or relocate 6 pendent sprinklers based on NFPA 13 and City requirements for the tenant improvement. Status: Permit Issued | Not published | $1.5K |
| applied Sep 24 | #BLDCA26-0304 Building · Alteration Creating new offices, replacement of existing windows and interior wall remodel to create cased openings with half wall at Tacoma Rescue Mission. Status: Permit Issued | Not published | $75K |
| applied Apr 23 | #FIREC26-0072 Building · Fire Protection Design and install a new wet system based on NFPA 13R and City requirements for the building addition at Tacoma Rescue Mission. Status: Finaled | Not published | $100K |
| applied Feb 27 | #FIREC26-0040 Building · Fire Protection Install a Full FIRE ALARM ADDITION TO PHASE 2 OF THE TACOMA RESCUE MISSION PROJECT Status: Finaled | Not published | $50K |
| applied Apr 14 | #MECHC26-0075 Building · Mechanical · Furnish and install: (3) Packaged Gas Heat Rooftop Units (RTU) · Furnish and install: (2) Split Heat Pump Systems and associated piping · Furnish and install: (1) Ductless Split System and associated piping · Furnish and install: (2) Energy Recovery Ventilator (ERV) for code required ventilation… Status: Finaled | Not published | $255K |
| applied Dec 16 | #MECHC25-0317 Building · Mechanical Mechanical permits that were reviewed and approved under BLDCA25-0107 Status: Permit Issued | Not published | $450K |
| applied Dec 16 | #PLMBC25-0310 Building · Plumbing Plumbing permits that were reviewed and approved under BLDCA25-0107 **Field REvision 1:FRC26-0038_2.11.26_DRAWINGS.correct plumbing that is not allowed to be encase in concrete. Revised drawings show Plumbing lines have been routed to avoid grade beam conflicts. ***FIELD REVISION APPROVED 02/18/26… Status: Finaled | Not published | $290K |
| applied Apr 14 | #BLDCA25-0107 Building · Alteration Three story building addition of approximately 24,227 SF to be used as Residential Dormitory at Tacoma Rescue Mission. **IF PLUMBING & MECHANICAL PLANS WERE SUBMITTED, THE BUILDING PERMIT ONLY COVERS PLAN REVIEW. SEPARATE PERMITS WILL BE REQUIRED FOR FEES & INSPECTION.** **Field Revision #1:… Status: Final Inspection | Not published | $3.6M |
| applied May 23 | #SDEV25-0172 Site OnSite development including grading, surfacing, and drainage improvements for Phase 2 of TRM Men's Shelter Addition and Modernization project. Status: Finaled | Not published | $175K |
| applied Sep 22 | #SDEV25-0309 Site Soldier pile shoring wall for excavation of the shelter expansion project. Status: Finaled | Not published | $150K |
| applied Oct 3 | #WO25-0121 Site Demolish existing gate, fence, curb, asphalt pavement, concrete walkway, guardrail, and yard drain. Relocate existing signs. Existing storm main, water main, and stairs to remain. Light pole removal and demo of existing underground power to be coordinated with electrical consultant. ***FRC25-0334… Status: Final Inspection | Not published | — |
| applied Oct 7 | #FIREC25-0247 Building · Fire Protection Installation and remodel of fire alarm system Status: Finaled | Not published | $50K |
| applied Sep 2 | #BLDCA25-0283 Building · Alteration Construct soldier beam shoring wall at Tacoma Rescue Mission. Status: Final Inspection | Not published | $150K |
| applied May 20 | #WO25-0068 Site Relocate existing retaining wall and improve walkway from building entrance to existing concrete sidewalk at Tacoma Rescue Mission. Phase One. **FRC26-0099 - 04/24/2026 - APPROVED: Record drawings for PH 1 WO** Status: Closed | Not published | — |
| applied Sep 30 | #BLDCA25-0309 Building · Alteration BUILDING PERMIT FOR NEW COLUMNS, GATES, FENCES AND CMU HALF WALLS THAT ARE PART OF BLDCA 24-0453 AND ARE SHOWN ON SDEV24-0420 AND WO25-0068 Status: Permit Issued | Not published | $12K |
| applied Oct 17 | #WATER25-0217 Utility Connection Connecting 3" Domestic Water Service to existing 2" Domestic Water Meter. Phase 1 of the Tacoma Rescue Mission Project (reference #SDEV24-0420). Status: Finaled | Not published | $6.8K |
| applied Aug 26 | #FIREC25-0197 Building · Fire Protection Modify the existing fire sprinkler system based on NFPA 13 and City Requirements for the new building addition and improvements. Status: Finaled | Not published | $70K |
| applied Sep 19 | #STORM25-0042 Utility Connection TWO NEW STORMWATER CONNECTION at TACOMA RESCUE MISSION MENS SHELTER- No work on the ROW, NO patch inspection needed ***Approved per SDEV24-0420*** Status: Finaled | Not published | $10K |
| applied Sep 2 | #STORM25-0040 Utility Connection THREE NEW STORMWATER CONNECTION at TACOMA RESCUE MISSION MENS SHELTER- No work on the ROW, NO patch inspection needed ***Approved per SDEV24-0420*** Status: Finaled | Not published | $19.8K |
| applied Jul 23 | #FIREC25-0168 Building · Fire Protection Relocate the existing 6" fire supply and 4" FDC underground for the new riser room. Work is based on NFPA 24 and City requirements. Status: Finaled | Not published | $8K |
| applied Mar 20 | #MECHC25-0084 Building · Mechanical Roof top HVAC units for Rescue Missions addition and modernization. **Field Revision1: FRC26-0044 Approved 2.13.26 *Field revision of the Gas Dry venting in Laundry Room 113. Status: Finaled | Not published | $350K |
| applied Mar 19 | #PLMBC25-0086 Building · Plumbing Construct a 4650SF single-story addition. Interior remodel of existing 3164SF rescue mission **09/04/2025 - Approved FR update to drawings** Status: Finaled | Not published | $125K |
| applied Nov 26 | #BLDCA24-0453 Building · Alteration Construct a 4650SF single-story addition. Interior remodel of existing 3164SF rescue mission. **Plumbing and Mechanical scopes require separate permits** Status: Final Inspection | Not published | $2.5M |
| applied Nov 26 | #SDEV24-0420 Site OnSite improvements to expand the existing building and construction of concrete walkways. ROW improvements within South Tacoma Way. Utility improvements include installation of stormwater area drains and relocation of water and sanitary sewer services. *** FRC25-0223- APPROVED- 09.10.2025- Revise… Status: Finaled | Not published | $156K |
| applied Jan 23 | #MECHC25-0031 Building · Mechanical Remove and replace existing ductless heat pump. Status: Finaled | Not published | $5K |
| applied Nov 22 | #BLDCA24-0451 Building · Alteration Voluntary repairs to portion of existing foundation at Commercial Building. Status: Finaled | Not published | $29.5K |