Commercial General Building, Fire Protection, Hvac/Mechanical, Plumbing work permitted January 10, 2025, with 19 permits through September 18, 2026, declaring $7,673,605 of work.
TI to create Ante/Postpartum Patient Rooms on two existing floors at the SJMC. Level 11 A Quad scope of work includes 8 new patient rooms and clinical support areas. Level 12 A Quad scope of work includes 7 existing rooms to be converted to Postpartum use, and clinical support areas, including medication and nourishment alcoves. ***FRC25-0089 APPROVED 05/08/25 Revisions to the Level 11 Patient Restrooms have been made to align with existing room layouts on the floor*** ***FRC25-0138 APPROVED 07/21/2025 Birth Center Expansion project modifies the ceiling scope in all L11 restrooms to align…
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
19 permits issued Jan 10 – Sep 18, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 4 |
Commercial and multifamily, biggest first.
#FIREC26-0186
Building · Fire Protection
Tenant improvement involving 26 sprinkler heads
Status: Permit Issued
| Not published |
| $35.4K |
| applied Sep 9 | #FIREC26-0192 Building · Fire Protection TI on level 1 oncology. New notification for layout. Status: Finaled | Not published | $6K |
| applied Aug 3 | #SEWER26-0558 Utility Connection Repair of sanitary sewer line at St, Joseph medical center. Open trench pending field approval of the CIPP method. No barricades, all on private property Status: Finaled | Not published | — |
| applied Jul 21 | #FIREC26-0143 Building · Fire Protection Relocate and add heads off existing OH wet system for TI area. Fire Sprinkler contractor is Apollo Mechanical Contractors APOLLMC864JQ Status: Finaled | Not published | $10.7K |
| applied May 20 | #PLMBC26-0110 Building · Plumbing Alteration of unoccupied suite within St Joseph Medical center to become a 16-chair infusion center. Plumbing drawings have been reviewed under the approved building permit BLDCA26-0043. Plumbing scope includes removing existing reverse osmosis and dialysis piping, demolishing two lavatories, five… Status: Finaled | Not published | $84K |
| applied May 18 | #MECHC26-0099 Building · Mechanical Alteration of an unoccupied suite within St. Joseph Medical Center to become a 16-chair infusion center. Mechanical scope includes moving 6 existing diffusers by less than 10 feet to move away from new walls, connecting to existing exhaust ductwork to add 2 new exhaust grilles and dampers,… Status: Permit Issued | Not published | $36K |
| applied Feb 18 | #BLDCA26-0043 Building · Alteration Alteration of an unoccupied suite within St. Joseph Medical Center to become a 16-chair infusion center. Scope to include demolition of non-bearing walls, casework, and finishes. New half-height walls, finishes, and rework of existing toilet rooms. **IF PLUMBING & MECHANICAL PLANS WERE SUBMITTED,… Status: Permit Issued | Not published | $1.8M |
| applied May 29 | #FIREC26-0100 Building · Fire Protection Modifying existing overhead fire sprinkler system to accommodate new tenant walls & ceilings. Status: Permit Issued | Not published | $8.6K |
| applied May 21 | #PLMBC26-0112 Building · Plumbing Demo and relocation/reconnection of existing medical gas piping. Installation of new medical gas outlets. Relocation of (1) existing hand sink. Status: Permit Issued | Not published | $33K |
| applied Apr 6 | #BLDCA26-0102 Building · Alteration The project consists of two separate interior spaces: 1. An interior remodel of existing Operating Room 3 and converting into a Hybrid Operating room including a new control room, interior finishes and medical equipment. 2. An equipment replacement of existing cath lab 4. **Separate permits… Status: Permit Issued | Not published | $1.6M |
| applied May 21 | #MECHC26-0104 Building · Mechanical Demo and relocation of ducts and grilles for the installation of a new clean suite (by others) in each space. at MEDICAL OFFICES Status: Permit Issued | Not published | $25.5K |
| applied May 28 | #FIREC26-0097 Building · Fire Protection Relocate sprinklers for new full height pharmacy carousel on Level 1 Status: Finaled | Not published | $3.7K |
| applied Mar 30 | #BLDCA26-0092 Building · Alteration Replacement of four pharmacy carousels and associated architectural and electrical work to accommodate new equipment at St.Joseph's Hospital. Status: Final Inspection | Not published | $143K |
| applied Feb 18 | #BLDCA26-0042 Building · Alteration Scope to include demolition of non-bearing walls, casework, fixtures, and finishes at St. Joseph's Hospital. Work is in correlation to separate tenant improvement permit. Status: Permit Issued | Not published | $140K |
| applied Jan 8 | #MECHC25-0008 Building · Mechanical Replace existing chiller with new Carrier air-cooled chiller on roof of central plant. ** Field Revision Approved.07.24.2025. Suction strainer removed, suction elbow replaced by a suction diffuser** Status: Finaled | Not published | $512K |
| applied Jun 22 | #PLMBC23-0192 Building · Plumbing Plumbing scope associated with Tenant Improvement project that creates Ante/Postpartum Patient Rooms on two existing floors at the St. Joseph Medical Center. Status: Finaled | Not published | $750K |
| applied Jun 22 | #MECHC23-0204 Building · Mechanical Mechanical scope associated with Tenant Improvement project that creates Ante/Postpartum Patient Rooms on two existing floors at the St. Joseph Medical Center. Status: Finaled | Not published | $750K |
| applied Jun 22 | #BLDCA23-0235 Building · Alteration TI to create Ante/Postpartum Patient Rooms on two existing floors at the SJMC. Level 11 A Quad scope of work includes 8 new patient rooms and clinical support areas. Level 12 A Quad scope of work includes 7 existing rooms to be converted to Postpartum use, and clinical support areas, including… Status: Final Inspection | Not published | $2.5M |
| applied Sep 12 | #FIREC24-0219 Building · Fire Protection 11th & 12th Floor TI: adding smoke coverage for new patient rooms and audibility and strobe coverage in common areas. Status: Finaled | Not published | $7.2K |