Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Seattle, WA
Multifamily Electrical, Elevator, Hvac/Mechanical work permitted July 25, 2025, with 5 permits through September 30, 2025, declaring $291,005 of work. Contractor on record: 16d LLC.
Get new commercial permits near 98103 or Seattle, free weekly email
Greenwood Arms Hydraulic Elevator Modernization including replacement of existing controller, hydraulic tank unit, fixtures, door operating device and door detection device. Extension of the return column in the elevator to accommodate for a new COP and riding lantern. No underground work required. EQP-SI-04148 / EQP-CY-00433 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1)
Seattle permit records name 16d LLC as the contractor on this project.
5 permits issued Jul 25 – Sep 30, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 16 | #7099793-ME Mechanical · Trade For the purpose of elevator modernization: Install split unit in existing elevator machine room and nearby outdoor space per plan |
Commercial and multifamily, biggest first.
Status: Completed
| Not published |
| $9.1K |
| applied Aug 5 | #7100076-EL Electrical · Electrical For the purpose of elevator modernization: Replace conventional FA panel with new addressable panel. Replace initiating devices with addressable. Install smoke detectors on elevator landings and elevator machine room. Install elevator control relays in machine room. Status: Completed | 16d LLC | $13.7K |
| applied Aug 5 | #7099796-RF Refrigeration · Trade For the purpose of elevator modernization: Refrigeration permit for 7099793-ME Status: Completed | 16d LLC | $9.1K |
#7099466-EL Electrical · Electrical ELECTRICAL FOR ELEVATOR MODERNIZATION Status: Completed | 16d LLC | $11.3K |
| applied Jul 25 | #7098154-CY Conveyance · Trade Greenwood Arms Hydraulic Elevator Modernization including replacement of existing controller, hydraulic tank unit, fixtures, door operating device and door detection device. Extension of the return column in the elevator to accommodate for a new COP and riding lantern. No underground work… Status: Completed | Not published | $257K |
In Seattle, biggest first.