Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Sign work permitted February 27, 2026, with 9 permits through September 7, 2026, declaring $382,413 of work. Contractor on record: Western Neon.
Construct tenant improvements for new office tenant [SCC SAFETY HUB] at ground level of mixed-use commercial building [SEATTLE CONVENTION CENTER] occupy per plan.
Seattle permit records name Western Neon, CTS and Columbia Fire as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
9 permits issued Feb 27 – Sep 7, newest first.
| Issued | Permit |
|---|
Commercial and multifamily, biggest first.
| Contractor |
|---|
| Value |
|---|
#7161513-EL Electrical · Electrical 1) Add (3) Data cables to conference room 2) Relocate/ revise one motion detector for exiting turnstile 3) Add one panic button under desk 4) Access control to garage man door 5) 120 volt circuit to garage for door power supply Status: Completed | Not published | — | |
| applied Aug 31 | #7159413-SB Sign, Awning and Canopy · Trade install on cut vinyl application to tenant window (C-Star) Status: Completed | Western Neon | $360 |
| applied Jun 23 | #7148734-SB Sign, Awning and Canopy · Trade install one LED and neon under-canopy sign (C-Star). 6/23/26 SS: Signage in windows requires a permit when when it exceeds 5 square feet (SBC 3107.4.1) Status: Completed | Western Neon | $9.1K |
#7142634-EL Electrical · Electrical · Provide and install [52] Cat6 cables installed between MDF and [29] workstation locations. · Provide and install [01] Composite Access Control cable between the IT Room and [05] Doors · Provide and install Access Control cable to [05] Door Release Button locations · Install Owner Provided Access… Status: Completed | CTS | — | |
#7140784-FS Fire Sprinkler and Suppression · Trade Modify the existing fire sprinkler system to accommodate the new architectural design. Status: Completed | Columbia Fire | $9.8K | |
| applied Mar 19 | #7133986-EL Electrical · Electrical *Joint Venture with Jenson Electric* TI space at the Seattle Convention Center. Adding Audibility and strobe coverage for the new TI space. Status: Completed | Jensen Electric, LLC | $3.2K |
| applied Feb 11 | #7122519-ME Mechanical · Trade MEP improvements to shelled office space to create new office space. Conference room, open and private offices, new gender-neutral restrooms, break room, and locker/storage room. per plans Status: Completed | McKinstry Co LLC | $150K |
#7131590-EL Electrical · Electrical Adding lights, controls, floor boxes, and receptacles to the convention center safety hub. conduit provisions for Fire alarm and telecom (by owner).[4/30/2026 JBC Changed Address from 801 E Pike ST to 810 Pike St] Status: Completed | Not published | — | |
| applied Dec 12 | #7120010-CN Addition/Alteration · Building Construct tenant improvements for new office tenant [SCC SAFETY HUB] at ground level of mixed-use commercial building [SEATTLE CONVENTION CENTER] occupy per plan. Status: Completed | Not published | $210K |
In Seattle, biggest first.