Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial Electrical, Hvac/Mechanical work permitted December 19, 2024, with 14 permits through October 13, 2026, declaring $471,520 of work. Contractor on record: Cochran Inc..
Replace indoor VAV water cooled DX vertical self contained AC units, per plan.
Seattle permit records name Cochran Inc., Macdonald Miller Facility Solutions LLC and Evergreen Power Systems, Inc as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 2 permits issued in the last 30 days is included with Pro.
See the contractor14 permits issued Dec 19 – Oct 13, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7167128-EL Electrical · Electrical Installing 36 cat 6 cables. Status: Completed | Contractor with Pro | — | |
#7166573-EL Electrical · Electrical 15-3280 PERFORM GENERATOR LOAD BANK Status: Issued | Not published | — | |
#7149306-EL Electrical · Electrical Install (1) 120V 20A circuit to split (2) receptacles that are currently on one circuit into their own circuits at the Discovery island in the cafeteria. Status: Completed | Cochran Inc. | — | |
| applied Apr 14 | #7135136-ME Mechanical · Trade Replace indoor VAV water cooled DX vertical self contained AC units, per plan. Status: Issued | Macdonald Miller Facility Solutions LLC | $336K |
#7121197-EL Electrical · Electrical Replace (1) 250A panelbaord on rooftop with like and kind new panelboard. Status: Completed | Cochran Inc. | $8K | |
#7107446-EL Electrical · Electrical Install (3) bugeye battery backed egress light fixtures in men's locker room coming off existing lighting circuit. Install (3) bugeye battery backed egress light fixtures in women's locker room coming off existing lighting circuit. Status: Completed | Cochran Inc. | $4.6K | |
#7103864-EL Electrical · Electrical Repair pathway lighting. Status: Completed | Cochran Inc. | $1.4K | |
#7093391-EL Electrical · Electrical 20267 - Adobe AHU9 - disconnect and reconnect existing 125a 480v AHU Status: Completed | Evergreen Power Systems, Inc | $2K | |
#7085582-EL Electrical · Electrical Replace (1) 4' section of broken LFMC on the roof. Status: Completed | Cochran Inc. | $1.2K | |
#7078314-EL Electrical · Electrical Add (2) receptacles and relocate (2) data lines for (2) new displays in the cafe. Status: Completed | Cochran Inc. | $3.5K | |
#7075981-EL Electrical · Electrical Install (1) 120V circuit from panel EP3 for BMS circuit. Status: Completed | Cochran Inc. | $4K | |
#7075978-EL Electrical · Electrical Replace (5) transformers at the Adobe building. Status: Completed | Cochran Inc. | $70K | |
#7061945-EL Electrical · Electrical Replace (1) like-in-kind 112.5kVA transformer (TD2C) and (2) like-in-kind 30kVA transformers (T1A & T3). Status: Completed | Cochran Inc. | $25.1K | |
#7061954-EL Electrical · Electrical Replace 47 like-in-kind BOH kitchen 2x2 LED lighting fixtures Status: Completed | Cochran Inc. | $15.9K |
In Seattle, biggest first.