Commercial General Building, Electrical work permitted April 23, 2025, with 8 permits through August 19, 2026, declaring $2,116,800 of work. Contractor on record: Prime Electric.
Seattle permit records name Prime Electric, McGann Electric LLC and Superelectric as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
8 permits issued Apr 23 – Aug 19, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7158862-EL Electrical · Electrical |
Commercial and multifamily, biggest first.
View Ridge Elementary - Job 2002845: Electrical scope at elementary School. Re-energize electrical panel/building power, Install remaining outlets in classrooms, Wire mold reinstall in classrooms, trouble shoot (1) Fire alarm device. [C.Kenefick 8/19/2026 - Prime Electric taking over job from plan…
Status: Completed
| Prime Electric |
| — |
#7153678-EL Electrical · Electrical The demo for View Ridge Elementary Seismic and Electrical upgrades required the removal of 1 heat detector from ceiling backbox and one pull station from wall backbox in order to extend their mudrings for new structural wall/ceilings and re-install same device on existing box. Status: Completed | Superelectric | — |
| applied Jan 22 | #7112291-CN Addition/Alteration · Building Construct voluntary seismic upgrades per plan. Status: Completed | Not published | $1.9M |
| applied Feb 9 | #7128191-EL Electrical · Electrical Electrical upgrades: Demolish existing 200A, 3-phase and 600A, 100A and 30A 1-phase knife switch service disconnects and 600A and 225A distribution panelboards. Provide new CT enclosure, meter bases, and service entrance rated panelboards. No load change planned for project. Electrical work as… Status: Completed | Prime Electric | $150K |
#7099464-EL Electrical · Electrical Joined venture with McGann. Portable classroom buildings are been remove. McGann is to remove and reconnect fire alarm cables. Red Hawk to reprogram devices. No new devices. We are looking to get fire marshal's office to sign off on the functionality final system. Status: Completed | Red Hawk Fire Protection | $800 |
#7086506-EL Electrical · Electrical Install backbone cabling to Portable 5. Also install 4 additional cables and one 6 strand fiber. Status: Completed | Pacific Communications Cabling | $9K |
| applied Mar 24 | #7077001-EL Electrical · Electrical Demo electrical feeders to classroom portables. Relocate portable distribution to better serve remaining classroom portables. Status: Completed | McGann Electric LLC | $20K |
#7082109-EL Electrical · Electrical Provide and install new 444LA vault onsite to capture existing power and communication conduits. Demolish 5 classroom portables. Status: Completed | McGann Electric LLC | $5K |