Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical, Sign work permitted March 17, 2025, with 10 permits through July 22, 2026, declaring $241,057 of work. Contractor on record: 16d LLC.
Modernization of controls, fixtures, and Peelle door board EQP-SI-04754 / EQP-CY-04951 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1)
Seattle permit records name 16d LLC, Evergreen Power Systems and Graffix as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
10 permits issued Mar 17 – Jul 22, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
| applied Jun 4 | #7145251-SB Sign, Awning and Canopy · Trade Exterior NW Corner Building Sign, Exterior Parking Directional Sign, Exterior Building Pole Banners, Exterior Street Pole Banners. 6/4/26 SS: Corrections noted during review, email sent to applicant. 7/22/216 SS: Revised plans received, proposed pole banners removed from scope of work (not allowed… Status: Issued | Graffix | $10.8K |
| applied Apr 30 | #7140880-FS Fire Sprinkler and Suppression · Trade Remove approx 130 recalled on/off style sprinkler heads through out the facility. This project will be completed in phases during gallery turnovers when there is no artwork on the walls. Shawn Shepherd is aware on this project. Status: Issued | Columbia Fire | $50K |
| applied Apr 6 | #7131898-ME Mechanical · Trade For the purpose of elevator modernization: Install split unit in existing elevator machine room and adjacent outdoor area. Status: Completed | Not published | $9.9K |
| applied Mar 5 | #7131900-RF Refrigeration · Trade For the purpose of elevator modernization: refrigeration permit Status: Completed | 16d LLC | $9.9K |
#7129750-EL Electrical · Electrical Replace elevator disconnect using existing feeders and upstream OCP. Relocate elevator utilization circuits OCP to machine room panel. Upgrade mach room and pit lighting to LED. Status: Completed | 16d LLC | — | |
| applied Feb 5 | #7127452-CY Conveyance · Trade Modernization of controls, fixtures, and Peelle door board EQP-SI-04754 / EQP-CY-04951 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Otis Elevator Company | $110K |
#7096167-EL Electrical · Electrical 20200 Frye - add/alter lighting, outlets, switches. Status: Completed | Evergreen Power Systems, Inc | $10K | |
#7094830-EL Electrical · Electrical Adding 6 devices. (1) Wheelock speaker strobe and (5) Wheelock strobe all ceiling mount. Status: Completed | Evergreen Power Systems | $4.1K | |
| applied Jun 28 | #7092295-ME Mechanical · Trade Misc duct and GRD modifications per mechanical plans. subject to field inspections (STFI) Status: Issued | Not published | $5K |
| applied Feb 5 | #7058609-CN Addition/Alteration · Building Construct interior alterations at existing institutional building at Level 1 restrooms near lobby per plan. Status: Completed | Not published | $41.2K |