Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Elevator, Hvac/Mechanical work permitted September 9, 2025, with 8 permits through October 19, 2026, declaring $617,509 of work. Contractor on record: 16d LLC.
EQP-SI-04474 / EQP-CY-05496 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) New controller with battery lowering, card reader provisions, power unit, new shut off valves, new rupture valve, new oil line and victaulic fittings, new powered Peelle car gate, new gate rails, guide shoes, motorized sheave, gate contact, warning buzzer, chain, counterweight, automatic dual light curtains, new retiring cam, powered hall operated sheaves, encoder, interlocks, unlocking devices, side tension latch
Seattle permit records name 16d LLC, ELTEC Systems LLC and EC Electric as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
8 permits issued Sep 9 – Oct 19, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
| applied Jul 16 | #7151736-CN Addition/Alteration · Building Construct interior non-structural alterations to add security gate for existing commercial retail tenant space [NOW] in commercial shopping center [ROOSEVELT SQUARE] per plan. Status: Issued | Not published | $15K |
| applied May 1 | #7139978-CN Addition/Alteration · Building Construct alterations to existing commercial building at South ground level per plan. Status: Issued | Not published | $150K |
| applied Feb 17 | #7123438-ME Mechanical · Trade For the purpose of elevator modernization: Install split unit in existing elevator machine room and nearby loading dock, per plans. Status: Completed | Not published | $10K |
| applied Jan 5 | #7123457-RF Refrigeration · Trade For the purpose of elevator modernization: Refrigeration permit for 7123438-ME Status: Completed | 16d LLC | $10K |
#7121331-EL Electrical · Electrical ELECTRICAL FOR ELEVATOR MODERNIZATION Status: Completed | 16d LLC | $12.7K | |
| applied Oct 22 | #7113012-CY Conveyance · Trade EQP-SI-04474 / EQP-CY-05496 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) New controller with battery lowering, card reader provisions, power unit, new shut off valves, new rupture valve, new oil line and victaulic fittings, new powered Peelle car gate, new gate rails, guide shoes, motorized… Status: Completed | ELTEC Systems LLC | $330K |
| applied Aug 20 | #7102509-EL Electrical · Electrical Electrical TI reusing existing lighting. Status: Completed | EC Electric | $15K |
| applied Jul 23 | #7096307-CN Addition/Alteration · Building Construct tenant improvements in existing commercial building (Amazon Peregrine) per plan. Status: Inspections Completed | Not published | $100K |
In Seattle, biggest first.