Multifamily General Building, Electrical, Elevator, Fire Protection, Hvac/Mechanical, Sign work permitted December 18, 2024, with 15 permits through December 10, 2025, declaring $5,135,774 of work. Contractor on record: Artline.
Install New Boiler
Seattle permit records name Artline, Best Plumbing and 4th Systems as the contractors on this project, among 7 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
15 permits issued Dec 18 – Dec 10, newest first.
| Issued | Permit |
|---|
Commercial and multifamily, biggest first.
| Contractor |
|---|
| Value |
|---|
#7120604-EL Electrical · Electrical Misc finish functional trim Items or piece work. Random scope of punch list items for building systems. We are doing/ installing/ changing all of the following: Exterior Can Lights, PABX Outlets Mod, Finish Washer Outlets, Camera Conduit, Bathroom GFCI's adds, Fitness Receptalces adds, Fitness… Status: Completed | 4th Systems | $20K | |
| applied Jul 7 | #7094590-FS Fire Sprinkler and Suppression · Trade Revision to issued permit # 6914113-FS permit, drawings and calculations need to have compass fire protection not modern labled. per Shawn Shepherd Remote areas need to be changed and re-calculated. per Shawn Shepherd. Status: Completed | Compass Fire Protection | $672K |
| applied Sep 17 | #7107216-CN Addition/Alteration · Building Complete and final for 6764248-CN subject to field inspection. Status: Completed | Not published | $10K |
| applied Sep 10 | #7105892-CY Conveyance · Trade install access control - Elev. 1 7045386-CY (Installation Permit) 2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1 Status: Issued | Artline | $1.5K |
| applied Sep 10 | #7105893-CY Conveyance · Trade install access control - Elev. 2 7045385-CY (Installation Permit) 2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1 Status: Issued | Artline | $1.5K |
| applied Sep 10 | #7105894-CY Conveyance · Trade install access control - Elev. 3 7045384-CY (Installation Permit) 2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1 Status: Issued | Artline | $1.5K |
#7093074-BP Boiler/Pressure Vessel · Trade Install New Boiler Status: Completed | Best Plumbing | $4.1M | |
#7093091-BP Boiler/Pressure Vessel · Trade Install New Boiler Status: Completed | Best Plumbing | $4.1M | |
#7093096-BP Boiler/Pressure Vessel · Trade New Boiler Install - Storage Tank Status: Completed | Best Plumbing | $4.1M | |
#7088200-EL Electrical · Electrical Wire thermostat and junctions for heat trace along piping for building. Power to be left for on-site electrician and will be under a separate permit. Status: Completed | Not published | $750 | |
| applied May 13 | #7085674-CY Conveyance · Trade Temp Use 7045384-CY (Original Installation Permit) 60-day temporary use permit valid from date signed by City of Seattle Elevator Inspector. Must have two-way communication with operator at all times. Status: Completed | Artline | $500 |
#7079424-EL Electrical · Electrical Low voltage wiring for garage CO sensors, panel and wiring. Hood exhaust/MUA interlock controls and RTU Control Panels. Status: Completed | Morgan Mechanical | $4.5K | |
#7063676-EL Electrical · Electrical Installation of Emergency Responder Communication Enhancement System Status: Completed | Day Wireless Systems | $82K | |
| applied Dec 23 | #7061350-SB Sign, Awning and Canopy · Trade Installation of 5 signs. A-West Elevation- Illuminated Channel Letters. B-East Elevation- Illuminated Channel Letters. C-North Elevation- Illuminated Channel Letters D-East Elevation- Illuminated Channel Letters. E-NW Elevation- Illuminated Channel Letters. 12/23/24 SS: Fees added for 4 sign… Status: Completed | Advanced Signs LLC | $22.2K |
| applied Dec 18 | #7061498-RF Refrigeration · Trade Install all copper refrigeration lines. mechanical permit 6918744-ME Status: Completed | Not published | $200K |