Multifamily Electrical, Elevator, Hvac/Mechanical work permitted November 20, 2024, with 9 permits through December 29, 2025, declaring $531,345 of work. Contractor on record: Kirby Electric.
VAV, grille, diffuser and make up air unit install per plans.
Seattle permit records name Kirby Electric, TK Elevator and B&H Fire And Security, LLC as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
9 permits issued Nov 20 – Dec 29, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7122423-EL Electrical · Electrical Like for like swap of a main 1600A breaker. [12/29/25 BGO - Approved Plan Set for 1600A Breaker Replacement] Status: Completed |
| Kirby Electric Incorporated |
| $2.7K |
| applied Nov 14 | #7116741-CY Conveyance · Trade REPLACING THE PUMP UNIT (EP-60 SUBMERSIBLE), SHUTOFF VALVE, OVERSPPED VALVE EQP-SI-05214 / EQP-CY-02492 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | TK Elevator | $6K |
#7110391-EL Electrical · Electrical INSTALL PIT HEAT DETECTOR AND SHUNT AC MONITORING. TIE IN TO EXISTING MODULES IN ELEVATOR MACHINE ROOM. PERMIT IS JOINT VENTURE WITH GUARDIAN SECURITY FOR PARTS & SMARTS. Status: Completed | B&H Fire And Security, LLC | $9.2K |
| applied Aug 25 | #7102955-CY Conveyance · Trade Elevator Cab Alterations includes: Wall Panels, Handrails, Ceiling with lights, and Cladding. EQP-SI-05214 / EQP-CY-02492 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Weight coming out: 562Lbs Weight going in: 548Lbs Status: Issued | Vertical Dimensions | $33.5K |
#7102597-EL Electrical · Electrical Elevator Modernization Status: Completed | Elmecco Inc | $15K |
| applied Jun 30 | #7093789-CY Conveyance · Trade EQP-SI-05214 / EQP-CY-02492 (2021 SBC=2019 A17.1=2023 NEC/SEC=2020 A18.1) ALTERATION: TOE GUARD, TAC32 CONTROLLER, BATTERY LOWERING, CAR DOOR, HALL AND CAR FIXTURES, HOISTWAY AND CAB WIRING, LD-16 DOOR OPERATOR, INTERLOCKS, 3D DOOR EDGE, TWO COMMUNICATIONS (2019 CODE), SLECTOR TAPE, COP, PIPE… Status: Completed | TK Elevator | $98.8K |
| applied May 19 | #7086626-EL Electrical · Electrical TI, FA, adding (72) devices, to (2) floors, existing FA system. Status: Completed | Kirby Electric | $35K |
| applied Sep 6 | #7039116-ME Mechanical · Trade VAV, grille, diffuser and make up air unit install per plans. Status: Completed | Not published | $320K |
| applied Nov 20 | #7057289-CY Conveyance · Trade Install Rubber Flooring (Weight coming out 98 lbs. / Weight going in 100 lbs.) EQP-SI-05214 / EQP-CY-06242 (2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1) Status: Completed | Chinook Elevator Solutions LLC | $11.1K |