Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Elevator, Hvac/Mechanical, Sign work permitted April 22, 2025, with 52 permits through October 19, 2026, declaring $1,799,212 of work. Contractor on record: Vertical Dimensions.
Construct blanket permit tenant improvements to future tenant on the 16th floor of existing commercial building per plan.
Seattle permit records name Vertical Dimensions, Cosco Fire Protection and Kirby Electric Incorporated as the contractors on this project, among 12 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 13 permits issued in the last 30 days is included with Pro.
Commercial and multifamily, biggest first.
52 permits issued Apr 22 – Oct 19, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 28 | #7163796-BK Tenant Improvment · Building Construct blanket permit tenant improvements to future tenant on the fourth floor of existing commercial building per plan. Status: Issued | Not published | $350K |
#7167415-EL Electrical · Electrical modification of the fire alarm system, adding (3) speaker strobe devices to suite 400 Status: Issued | Contractor with Pro | — | |
| applied Oct 9 | #7166420-ME Mechanical · Trade Scope relocating ductwork and sensors to accommodate new layout. Subject to Field Inspection - STFI Status: Issued | Contractor with Pro | $22.6K |
| applied Oct 9 | #7166422-ME Mechanical · Trade Scope relocating ductwork and sensors to accommodate new suites and layout. Subject to Field Inspection - STFI Status: Issued | Not published | $22.6K |
| applied Oct 9 | #7166425-ME Mechanical · Trade Scope relocating ductwork and sensors to accommodate new suites and layout. Subject to Field Inspection - STFI Status: Issued | Not published | $22.6K |
| applied Oct 9 | #7166429-ME Mechanical · Trade Scope relocating ductwork and sensors to accommodate new suites and layout. Subject to Field Inspection - STFI Status: Issued | Not published | $22.6K |
| applied Oct 9 | #7166426-ME Mechanical · Trade Scope relocating ductwork and sensors to accommodate new suites and layout. Subject to Field Inspection- STFI Status: Issued | Not published | $22.6K |
#7166798-EL Electrical · Electrical Relocating existing zone sensors as needed. Status: Issued | Contractor with Pro | — | |
#7166497-EL Electrical · Electrical Tenant improvements in suite 410 Status: Issued | Contractor with Pro | — | |
#7166500-EL Electrical · Electrical Tenant improvements in suite 430 Status: Issued | Contractor with Pro | — | |
#7166501-EL Electrical · Electrical Tenant improvements in elevator lobby & corridors Status: Issued | Contractor with Pro | — | |
#7166498-EL Electrical · Electrical Tenant improvements in suite 420 Status: Issued | Contractor with Pro | — | |
#7166495-EL Electrical · Electrical Tenant improvements in Suite 400 Status: Issued | Contractor with Pro | — | |
#7160297-EL Electrical · Electrical Demo/make safe of 4th floor in a commercial building Status: Issued | Kemly Electric, Inc. | — | |
#7160262-EL Electrical · Electrical Adding (Qty.4) Speaker Strobes to area lacking coverage. Status: Issued | Cosco Fire Protection | — | |
#7160265-EL Electrical · Electrical Adding (3) SD500 devices to area for protection. Status: Completed | Cosco Fire Protection | — | |
| applied Jun 26 | #7127801-ME Mechanical · Trade Install new Mitsubishi, per plan. Status: Issued | Not published | $21.4K |
| applied Jun 4 | #7142648-ME Mechanical · Trade Install one 2-ton split system outdoor wall mount heat pump unit with one indoor wall hung ductless air handler unit, and one condensate pump, per plan. Status: Issued | Not published | $13.9K |
| applied Jul 7 | #7151453-CY Conveyance · Trade MOD: Traction elevator modernization of passenger elevator 6 to include replacement of traction overhead machines, door operating devices, door protection devices, control operating panel, controller, and fixtures. EQP-SI-05902 / EQP-CY-03675 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Issued | Not published | $394K |
| applied Jun 3 | #7145815-CY Conveyance · Trade Elevator cab alterations includes: WALL PANELS, HANDRAILS, CEILING with LIGHTING, FLOORING EQP-SI-05902 / EQP-CY-03732 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Weight going in: 457 lbs. Weight coming out: 468 lbs. Status: Issued | Vertical Dimensions | $26.9K |
| applied Jun 3 | #7145823-CY Conveyance · Trade Elevator cab alterations includes: WALL PANELS, HANDRAILS, CEILING with LIGHTING, FLOORING EQP-SI-05902 / EQP-CY-03669 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Weight going in: 457 lbs. Weight coming out: 568 lbs. Status: Issued | Vertical Dimensions | $26.9K |
| applied Jun 3 | #7145834-CY Conveyance · Trade Elevator cab alterations includes: WALL PANELS, HANDRAILS, CEILING with LIGHTING, FLOORING EQP-SI-05902 / EQP-CY-03670 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Weight going in: 470 lbs. Weight coming out: 482 lbs. Status: Issued | Vertical Dimensions | $26.9K |
| applied Jun 3 | #7145841-CY Conveyance · Trade Elevator cab alterations includes: WALL PANELS, HANDRAILS, CEILING with LIGHTING, FLOORING EQP-SI-05902 / EQP-CY-03672 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Weight going in: 433 lbs. Weight coming out: 444 lbs. Status: Completed | Vertical Dimensions | $26.9K |
| applied Jun 3 | #7145850-CY Conveyance · Trade Elevator cab alterations includes: WALL PANELS, HANDRAILS, CEILING with LIGHTING, FLOORING EQP-SI-05902 / EQP-CY-03673 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Weight going in: 433 lbs. Weight coming out: 444 lbs. Status: Completed | Vertical Dimensions | $26.9K |
| applied Jun 3 | #7145854-CY Conveyance · Trade Elevator cab alterations includes: WALL PANELS, HANDRAILS, CEILING with LIGHTING, FLOORING EQP-SI-05902 / EQP-CY-03674 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Weight going in: 433 lbs. Weight coming out: 444 lbs. Status: Issued | Vertical Dimensions | $26.9K |
| applied Jun 3 | #7145858-CY Conveyance · Trade Elevator cab alterations includes: WALL PANELS, HANDRAILS, CEILING with LIGHTING, FLOORING EQP-SI-05902 / EQP-CY-03675 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Weight going in: 433 lbs. Weight coming out: 444 lbs. Status: Issued | Vertical Dimensions | $26.9K |
| applied May 14 | #7142653-RF Refrigeration · Trade Install refrigerant piping for one 2-ton split system heat pump. Status: Issued | Performance Heating and AC | $800 |
#7139586-EL Electrical · Electrical Replace Fire Alarm main board on node 2. Status: Issued | Fire Systems West, Inc. | — | |
| applied Mar 24 | #7134626-CY Conveyance · Trade Elevator car alterations includes: WALL PANELS, HANDRAILS, CEILING with LIGHTING, FLOORING EQP-SI-05902 / EQP-CY-03671 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Weight going in: 453 lbs. Weight coming out: 464 lbs. Status: Completed | Vertical Dimensions | $26.9K |
#7131119-EL Electrical · Electrical Install cellular communicator. Status: Issued | Not published | — | |
| applied Feb 9 | #7128468-CY Conveyance · Trade Traction elevator modernization of passenger elevator 3 to include replacement of traction overhead machines, door operating devices, door protection devices, control operating panel, controller, and fixtures. EQP-SI-05902 / EQP-CY-03670 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Not published | $394K |
| applied Feb 4 | #7127798-RF Refrigeration · Trade Install new Mitsubishi in elevator machine service room. Status: Issued | Not published | $21.4K |
| applied Sep 29 | #7109108-EL Electrical · Electrical For the purpose of tenant improvement: Replace existing ceiling fire alarm speakers and relocate to new ceiling grid. Install new speakers per plan. Relocate existing smokes to new ceiling grid. Status: Completed | Kirby Electric Incorporated | $9.9K |
#7118229-EL Electrical · Electrical Adding relays to the 1st floor lobby and 3rd floor winter garden that will trigger upon fire alarm to cut out music playing in these spaces.We also need to relocate a speaker from the stairwell to the lobby Status: Issued | Not published | $1.1K | |
| applied Nov 5 | #7115198-RF Refrigeration · Trade Replace 7.5 ton heat pump with a new Trane 10 ton heat pump Status: Completed | Dynamic HVAC | $20K |
| applied Sep 8 | #7105361-BK Tenant Improvment · Building Construct blanket permit tenant improvements to future tenant on the 16th floor of existing commercial building per plan. Status: Completed | Not published | $474K |
| applied Oct 22 | #7112980-CY Conveyance · Trade Traction elevator modernization of passenger elevator 1 to include replacement of traction overhead machines, door operating devices, door protection devices, control operating panel, controller, and fixtures. EQP-SI-05902 / EQP-CY-03732 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Not published | $394K |
#7113090-EL Electrical · Electrical In suite 1454, we are going to demo as needed. Add (2) receptacles and provide and install (2) FA speaker strobes utilizing the proprietary building vendor for their parts and smarts. Status: Completed | Kirby Electric Incorporated | $2.5K | |
| applied Sep 30 | #7105612-CY Conveyance · Trade Traction elevator modernization of passenger elevator 5 to include replacement of traction overhead machines, door operating devices, door protection devices, control operating panel, controller, and fixtures. EQP-SI-05902 / EQP-CY-03672 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Not published | $394K |
| applied Sep 30 | #7105941-CY Conveyance · Trade Traction elevator modernization of passenger elevator 6 to include replacement of traction overhead machines, door operating devices, door protection devices, control operating panel, controller, and fixtures. EQP-SI-05902 / EQP-CY-03673 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Not published | $394K |
#7107942-EL Electrical · Electrical Relocate 4 low volt thermostats suite. 1607 Status: Completed | Dynamic HVAC, LLC | $1K | |
| applied Jul 2 | #7090087-ME Mechanical · Trade Replace 7.5 ton heat pump with a new Trane 10 ton heat pump Status: Completed | Not published | $90K |
| applied Aug 29 | #7103698-ME Mechanical · Trade Relocating (9) grilles. Replacing (1) Exhaust Fan STFI (Subject to Field Inspection) Status: Completed | Vital Mechanical Inc | $10.8K |
| applied Aug 27 | #7103220-ME Mechanical · Trade Tenant improvement in suite #1607. Relocate existing thermostats; supply and return grills; install new small return grills; cap existing ducts and exhausts. No new mechanical units. Subject to field inspection, STFI. Status: Completed | Not published | $20K |
#7103632-EL Electrical · Electrical MINOR TI, DEMO WALLS, REPLACE 105 LED LIGHT FIXTURES, ALTER 20 CIRCUITS. Status: Completed | Sea-Tac Electric | $48.6K | |
| applied Jul 14 | #7085161-CN Addition/Alteration · Building Construct alterations to exterior storefront at ground level doors and access ramp of Suite A at landmark Medical Dental Building per plan. Status: Completed | Not published | $40.2K |
#7101635-EL Electrical · Electrical For the purpose of Tenant Improvement, relocate and replace suite fire alarm speakers Status: Completed | 16d LLC | $3.3K | |
| applied May 14 | #7079762-CN Addition/Alteration · Building Tenant improvements in existing commercial building in suite 634 on 6th floor per plan Status: Completed | Not published | $201K |
| applied May 21 | #7086424-CY Conveyance · Trade Traction elevator modernization of passenger elevator 2 to include replacement of traction overhead machines, door operating devices, door protection devices, control operating panel, controller, and fixtures. EQP-SI-05902 / EQP-CY-03669 (2021 SBC=2019 A17.1=2023 NEC/SEC=2020 A18.1) Status: Issued | Not published | $394K |
| applied Jan 28 | #7052625-CN Addition/Alteration · Building Construct alterations to telecommunications facility (AT&T) at multiple levels of existing commercial building per plan Status: Issued | Not published | $30K |
| applied Apr 1 | #7076967-SB Sign, Awning and Canopy · Trade Double Sided LOW voltage (LED) Blade Sign remove and replace current. Joint venture with Western Neon - electrical contractor responsible for performing installation. 3/24/25 SS: Western Neon added as electrical contractor responsible for installation. Site is a historic city landmark, requires a… Status: Completed | Artco Sign Co. Inc | $20K |
#7081925-EL Electrical · Electrical Electrical upgrades for an elevator modernization to meet current elevator codes.[11/12/2025 JBC Added One more Feeder to Permit]. 3/25/2026 jnl renewal Status: Issued | Merit Electric, Inc. | $37.1K |
In Seattle, biggest first.